Find best Interview questions and answer for TeamPlus Staffing Solution Job. Some people added TeamPlus Staffing Solution interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best TeamPlus Staffing Solution Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for TeamPlus Staffing Solution interview or job.
This page contains the most recently asked technical questions and answers in the TeamPlus Staffing Solution.
All of the questions listed below were collected by students recently placed at TeamPlus Staffing Solution.
- General Aptitude Interview Questions of TeamPlus Staffing Solution
- Trainee Interview Questions of TeamPlus Staffing Solution
- Personal Questions round Interview Questions of TeamPlus Staffing Solution
- HR Interview Questions of TeamPlus Staffing Solution
- Lead Interview Questions of TeamPlus Staffing Solution
Turn on a switch and leave it for some ten minutes. Turn it off, turn a second one on and open the door and go into the room. The glowing bulb corresponds to second switch. The bulb that is hot corresponds to first switch, as it was turned on for ten minutes and have heated up. The cold and not-glowing bulb corresponds to the third switch
40 km avrege speed
24 Kmp/h
13km
let the average of 25 person be x
total age of a person=average×no.of person
total age of 25 person=X×25
=25X
when a new person of 46kg come average decrease by 5kg(X-5)
Total age of 26 person =25x+46
Average age of 26 person=X-5
A/Q
.25X+46=26(X-5)
25X+46=26X-130
26X-25X=130+46
X =176
hence the av. of 25 person be 176kg
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
Options:
A) EDRIRL
B) DCQHQK
C) ESJFME
D) DEQJQM
Ans: A)
he removed one bolt in each three wheels
and fixed the bolts in stephiny wheel