I’m the capable of what u expect from me and you should say what is the tallent u have which is used for that company…π₯°
Lawyer
130
520 = 26 * 20 = 2 * 13 * 22 * 5 = 23 * 13 * 5
Required smallest number = 2 * 13 * 5 = 130
130 is the smallest number which should be multiplied with 520 to make it a perfect square.
Mohammad Gauri
20
speed of downstream=speed at still water+flow
= 15+5=20
(x**2 – 6* x + 5) = (x-1)*(x-5)
(x**2 + 2 * x + 1) = (x + 1) * (x+1) = (x+1)**2
For what x is (x-1)*(x-5)/( (x+1)**2) a minimum?
One way to answer this question is by using calculus.
Take the derivative, and set to zero.
Since this is a fraction of polynomials, and a fraction is
zero only if it’s numerator is zero, we need calculate only
the numerator of the derivative and set it to zero.
The numerator of the
Derivative of (x-1)*(x-5)/( (x+1)**2) is
( (x-1) + (x-5) ) ( x+1)**2 – (x-1)(x-5)( 2 (x+1) )
= (2 x – 6) (x+1)**2 – (2) (x-1)(x-5) (x+1)
= 0
Divide through by 2 (x+1)
(x-3)(x+1) – (x-1)(x-5) = 0
(x**2 – 2 x – 3 ) – (x**2 – 6 x + 5) = 0
x**2 – x**2 – 2 x + 6 x – 3 – 5 = 0
4 x – 8 = 0
x = 2
Plugging in x = 2 into the original
(x**2-6*x+5)/(x**2+2*x+1)
gives us (2**2 – 6 * 2 + 5)/(2**2 + 2*2 + 1)
= (4 – 12 + 5) / (4 + 4 + 1) = -3/9 = -1/3
Least value is -1/3
around 29.8
Put switch 1 on and leave it on for 2 minutes, then switch it off.
Put switch 2 on and leave it on, then walk into the room.
If the light is on, the answer is switch 2.
If the light is off but the bulb is warm when you feel it, the answer is switch 1.
If the light is off and the bulb is cold when you feel it, the answer is switch 3.
Nice
Distance =speed Γtime
Speed =90kmph
90km take 60min time to reach
In 10min the distance covered =?
D=90Γ10/60
900/60
D=15
answer :
Let the distance which I walk to the station be x km Then Time needed to reach the station at 3 km/hr = (3xβ+602β) hrs and
Time needed to reach the station at 4 km/hr = (4xβ+602β) hrs But 3xβ+301β=4xββ301ββ3xββ4xβ=β302β=151β
β124xβ3xβ=151ββ12xβ=151ββx=1512β=54β km
One day work = 1 / 20
One mans one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)
The total no. of days required to complete the work = (75 * 20) / 50 =
30
10*(root 2)
414 Rs
1.2*37.8=45.36=46 sq.feet
46*9=414 RS
first 10 odd num are 1,3,5,7,9,11,13,15,17,19
sum=100
avg=100/10
avg of 10 odd num =10