Find best Interview questions and answer for Avasoft Job. Some people added Avasoft interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Avasoft Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Avasoft interview or job.
This page contains the most recently asked technical questions and answers in the Avasoft.
All of the questions listed below were collected by students recently placed at Avasoft.
Here is the ans with explanation…..
Just divide 48 hours into 8 parts…
for flowchart its 1/4 so it is 2/8 = 12hours
For Coding it is 3/8 = 18 hours
the rest is again 3/8 = 18 hours for debugging..
A parabola is obtained as the intersection of a cone with a
plane
Let the person ate x banana on first day, so below is the equation for five days
X+x+6+x+12+x+18+x+24=100
So, he ate 8 banana first day
15
(130+x)/30=(45×5/18)
245 meters
let (xy) be original number.
then, 10y + x +45 = 10x + y; eq 1
and x + y = 13; eq 2
solve ab equation,
then xy = 94;
Speed Ratio = 1:7/6 = 6:7
Time Ratio = 7:6
1 ——– 7
4 ——— ? 28 m
31
444km
Since the speed diff is 5km/h
It takes 12 hrs to cover 60 extra kms
Therefore in 12 hrs the total dist covered is
Relative speed×time=(21+16)×12=444 kms
Take one fruit from box with label mixture. If we see
orange, because the basket lies (it cant have a mixture),
then it has only oranges. The other 2 are labeled apples and
oranges. The one labeled apples,
cannot have oranges inside, cos they are allready been
identified, and because it lies, it cannot have apples either.
So it has a mixture. And we are left with the one labeled
oranges that lies and has apples.