Total game played= 60
%won =30%
Total won= 60*30/100 i.e. 18
now team plays x games and win all of those to increase the
average to 50%.
So,
(60+x)*50/100=18+x
(60+x)/2=18+x
60+x=36+2x
24=x
So the final answer is 24.
1, 3, 10, 21, 64, 129, 356, 777
a
X = 4
1.7% loss
D
What was his salary to begin with?
Assume his salary was Rs. X
He earns 5% raise. So his salary is (105*X)/100
A year later he receives 2.5% cut.
So his salary is ((105*X)/100)*(97.5/100)
which is Rs. 22702.68
So Ans is Rs.22176
2/3 * 15 miles = 10 miles then
time for 10 miles travel is t1 = 10/40 = 1/4
then remaning distance is 5 miles
time for 5 miles travel is t2 = 5/60 = 1/12
t1+ t2= 1/3 in seconds * 60 = 20 min
name
4
speed = distance / time.
240/16=15m/sec=54km/hr
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
let no. of boys not participating be x
then the no. of girls not participating = x+5
no. of boys : girls participating = 3:2
given no.of boys participating = 15
therefore, the ratio is now 15:y(say)
then 3:2 = 15 : x
on solving 3/2 =15/y ie.., 3y =30 we get y =10
hence no. of girls participating =10
therefore total no of students paricipating = 15+10=25
total no of students in class =60 given
hence no. of students not participating = 60-25=35
therefore x+(x+5)=35
2x=30
x=15
therfore no of girls not participating =15+5=20
therefore total no of girls in class = no of girls
participating + no of girls not participating
=10+20
=30 is the answer
MEDICINE will become EOJDJEFM in the same code.
5A=3B,
*3 SO,
15A=9B