Rs. 1500
They’ll never meet unless some of them stop and other continue to run
length is 30 breadth is 12 and height is 12
——————————
1
.——————————
1 .
1 .
1 10 .
1
1 .
1
1
1 30 .
——————————-.
1
consider right angled triangle
so the distance= square root of (30*30+10*10)
2.5 sec
1/x
11
39/50
441=21^2
45
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
A & B one day work= 1/18 + 1/30= 8/90
As we know that number of work is 1
1÷8/90= 1*90/8= 90/8.
Since they say “ twice the amount of work
Then ,2*90/8= 22.5 days
1728
55 + 70 = 125
125/14hrs = 60 mph
14 hours
Books=65+50=>115
Prices=1150+920=>2070
2070/115
18
1/2:1/3:1/4 = 6:4:3
Ram = 6/13 * 3250 = 1500,
Shyam = 4/13 * 3250 = 1000,
Mohan = 3/13 * 3250 = 750
Call from HR for interview in an unexpected time!
General formula for simple interest is SI=PTR/100
Then P= SI x 100 / TR
Here SI= rs.24, T= 2 years, R = 10%
P= 24 x 100 / 2 x 10 = 120 Rs
Answer : Rs. 120