Ques:- Ramesh can finish a work in 20 days and Sushil in 25 days. They both work together for 5 days and then Sushil goes away. In how many days will Ramesh complete the remaining work?
Recent Answer : Added by DK BOSS On 2021-07-17 10:05:29:
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
Ques:- Who referred you to this company?
Ques:- Tell me something about you & your experience?
Ques:- My personal Information
Ques:- What is your role in this company?
Ques:- Given two tables Student(SID, Name, Course) and Level(SID, level) write the SQL statement to get the name and SID of the student who are taking course = 3 and at freshman level.
Ques:- A work is done by two people in 24 minutes. One of them alone can do it in 40 minutes. How much time will the other person wiil take to complete it
Recent Answer : Added by Admin On 2020-05-17 12:00:32:
1/24-1/40
(5-3)/120
2/120
1/60
60 minutes
Ques:- “your director is in another part of the region when you receive an email from another dept requiring the return of a draft framework for a 2 yr strategic plan by 5pm the same day. You realize the originals are with your director.what would you do?
Recent Answer : Added by ashutosh chaturvedi On 2021-04-02 17:17:06:
i will drop a mail saying that can you pleaae meal me the the originals of the stregic plan
Ques:- What will be your notice period?
Ques:- A train 100 meters long completely crosses a 300 meters long bridge in 45 seconds. What is the speed of the train is?
Recent Answer : Added by suhad On 2022-09-02 17:04:44:
32 Km/hr
Ques:- Why you wish to join Tanishq and your aim.
Ques:- What songs best describes your work ethic?
Ques:- What is the basic need for a sales personal?
Recent Answer : Added by Mastanbi On 2022-05-17 09:07:48:
Active listening,Effective communication,Confidence.
Ques:- Which is your dream company and why?
Ques:- A man travels a roller coaster. He says 1/3rd of the children are before me and 3/4th of the children behind me. How many of them are there?
Ques:- Find the amount on Rs.8000 in 9 months at 20% per annum, if the interest being compounded quarterly?
Recent Answer : Added by shareef shaik On 2021-06-16 20:53:13:
1261
Ques:- Mr. T has a wrong weighing pan. One arm is lengthier than other. 1 kilogram on left balances 8 melons on right. 1 kilogram on right balances 2 melons on left. If all melons are equal in weight,what is the weight of a single melon?
Recent Answer : Added by samarth khare On 2021-06-23 17:56:06:
Suppose the lengthier arm of weighing pan is of x cm and other arm is y cm .Also let weight if each melon be m kg.
so applying equilibrium of torque principles ,we get
case 1:-
1x-8my=0
case 2:-
2mx-1y=0
using case 1 equation , we substitute value of x into case 2 equation;
16mmy-1y=0
(16mm-1)y=0
y is length of weighing arm and cannot be 0,
therefore ,
16mm-1 =0
16mm=1
mm=1/16
m= square root (1/16)
m=+-1/4
m is weight of melon and cant be negative.
Hence m, weight of one melon is 1/4 kg
Ques:- What do you do to prioritized on a given workday?
Ques:- Can you work well in a team? Please share some of your strategies for executing good team work?
Ques:- What you will be Good carrier
Ques:- Which of the following statements drawn from the given statements are correct?Given:All watches sold in that shop are of high standard. Some of the HMT watches are sold in that shop.a) All watches of high standard were manufactured by HMT.b) Some of the HMT watches are of high standard.c) None of the HMT watches is of high standard.d) Some of the HMT watches of high standard are sold in that shop.
Ques:- There is a 50m long army platoon marching ahead. The last person in the platoon wants to give a letter to the first person leading the platoon. So while the platoon is marching he runs ahead, reaches the first person and hands over the letter to him and without stopping he runs and comes back to his original position. In the mean time the whole platoon has moved ahead by 50m. The question is how much distance did the last person cover in that time. Assuming that he ran the whole distance with uniform speed.
Recent Answer : Added by Admin On 2020-05-17 12:00:37:
The last person covered 120.71 meters.
It is given that the platoon and the last person moved with
uniform speed. Also, they both moved for the identical
amount of time. Hence, the ratio of the distance they
covered – while person moving forward and backword – are
equal.
Let’s assume that when the last person reached the first
person, the platoon moved X meters forward.
Thus, while moving forward the last person moved (50+X)
meters whereas the platoon moved X meters.
Similarly, while moving back the last person moved [50-(50-
X)] X meters whereas the platoon moved (50-X) meters.
Now, as the ratios are equal,
(50+X)/X = X/(50-X)
(50+X)*(50-X) = X*X
Solving, X=35.355 meters
Thus, total distance covered by the last person
= (50+X) + X
= 2*X + 50
= 2*(35.355) + 50
= 120.71 meters
Note that at first glance, one might think that the total
distance covered by the last person is 100 meters, as he
ran the total lenght of the platoon (50 meters) twice.
TRUE, but that’s the relative distance covered by the last
person i.e. assuming that the platoon is stationary.
Ques:- Personal influence at Mundra.
Ques:- In 60 reems of paper 40 reems were utilised then what percent will remain?
Recent Answer : Added by Admin On 2020-05-17 11:59:18:
Total=60reems
Utilized=40reems
Un utilized= 60-40=20
Percentage of remainder 20/60=.3333
0.33333*100=33.333%
Ques:- IN which year planning commission was set up in Independent India
Ques:- How do you evaluate success?
Ques:- Find the odd man out:
3, 5, 7, 12, 17, 19
A. 19
B. 17
C. 13
D. 12
Recent Answer : Added by Veeresh On 2022-08-14 16:35:30:
D.12
Ques:- Would you be able to manage travelling as you are presently in sitting jobs & will you be able to handel a team of set people?
Ques:- There are so many big companies like Reliance, Satyam,Infosys etc…But, y do u want to work for our company only?
Ques:- 1/8 is devided by ‘s’ , if ‘s’ is incresed by 2 times, what is the result.
Recent Answer : Added by Chinnepalli Rajesh On 2020-12-23 16:10:25:
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.