- Safetrax (mtap technologies) General Aptitude Interview Questions
- Safetrax (mtap technologies) Trainee Interview Questions
- Safetrax (mtap technologies) Personal Questions round Interview Questions
- Safetrax (mtap technologies) HR Interview Questions
- Safetrax (mtap technologies) Lead Interview Questions
Time =9 seconds
Speed =(60×518) m/sec=(503)m/sec
∴ Speed =DistanceTime
Length of the train (Distance) = (Speed × Time) = (503×9) m=150 m.
2:3
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
(3)^ 7.5 ÷ (27)^1.5 x (9)^2 = 3?
⇒(3)^7.5 ÷ {(3)^(3 x 1.5)} x {(3)^(2 x 2)} = 3 ?
⇒ 3^(7.5 – 4.5 + 4) = 3?
⇒ 3^7 = 3?
⇒ ? = 7
Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .
Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South
Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles
Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles
Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south
c
Summation of 301 – summation of 99
=41550
Summation of n=((n*n+1)/2)
48,400
15, 16, 34, 105, 424, 2124, 12576
The series is 15, 16, 34, 105, 424, 2124, 12576
1) (15*1) + 1 = 16
2) (16*1) + 2 = 34
3) (34*3) + 3 = 105
4) (105*4) + 4 = 424
5) (424*5) + 5 = 2125
Clearly, they gave 2124 instead of 2125, so it is the wrong number in the series.
if rs 12 and rs 15 per meter then 750*12+750*15
7500
1 through 24, divisible by 2 in descending order.
That leaves you with:
24, 22, 20, 18, 16, 14, 12, 10, 8, 6, 4, 2
8th place FROM the bottom means your answer will be 16.
Answers as expected
A