8 days
Question is not completed
The letters A, B, C, D, E, F and G, not necessarily in that order, stand for seven consecutive integers from 1 to 10
D is 3 less than A
B is the middle term
F is as much less than B as C is greater than D
G is greater than F
1. The fifth integer is
(a) A
(b) C
(c) D
(d) E
(e) F
ans:a
2.A is as much greater than F as which integer is
less than G
(a) A
(b) B
(c) C
(d) D
(e) E
ans:a
3. If A = 7, the sum of E and G is
(a) 8
(b) 10
(c) 12
(d) 14
(e) 16
4. An integer T is as much greater than C as C is
greater than E. T
can be written as A + E. What is D?
(a) 2
(b) 3
(c) 4
(d) 5
(e) Cannot be determined
ans:a
let the speed limit be x.
speed by first rider S1 and 2nd rider be S2.
S1=x+10;
ans S2=x+2*10; and given S2=35.
solving we get x=15mph.
let’s say the Cost Price is 1000x. (CP)
The selling price is also the same as the Cost price. So, here SP=CP (But he sells 950gm instead of 1000gm)
Instead of 1000gm, he is selling 950 grams at the CP. So he sells 050 gms @1000x price. So his net profit is 50gm.
Now 1000gm is 1000x Rs
So, 50gms is 50x rs. [Apllied Unitary Method]
So his profit percentage is:
Profit Percentage Formula: {(Profit/CP)*100%}
So, Here profit is 50x;
CP is 1000x;
so putting the value in the formula we get, Profit Percentage is: (50x/1000x)*100% =(5000x/1000x)%=5%.
length of train = 150 m
45 km/hr
47
divide 100 by 7, and you get 14.28. (Obviously you aren’t talking about decimals here) and so 14 numbers can be divisible by 7 up to 100.
The answer is 14.
Here is the ans with explanation…..
Just divide 48 hours into 8 parts…
for flowchart its 1/4 so it is 2/8 = 12hours
For Coding it is 3/8 = 18 hours
the rest is again 3/8 = 18 hours for debugging..
180*2/3 = 60degree