C will get RS 95
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
4
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
a:37
b:22
c:50
d:11
e:25
f:27
105/29 mins
7 : 3
Suppose the lengthier arm of weighing pan is of x cm and other arm is y cm .Also let weight if each melon be m kg.
so applying equilibrium of torque principles ,we get
case 1:-
1x-8my=0
case 2:-
2mx-1y=0
using case 1 equation , we substitute value of x into case 2 equation;
16mmy-1y=0
(16mm-1)y=0
y is length of weighing arm and cannot be 0,
therefore ,
16mm-1 =0
16mm=1
mm=1/16
m= square root (1/16)
m=+-1/4
m is weight of melon and cant be negative.
Hence m, weight of one melon is 1/4 kg
Ans is 25
Answer :sister- in- law
explanation: y is the daughter of x’s brothers wife’s father-in-law = y is the daughter of x’s brother’s wife’s father = y is the wife of x’s brother = y is x’s sister-in-law
2years