Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Ques:- Do you like taking risks?
Recent Answer :
: only if the results are greater than my input
Ques:- “Raw” means ?
Recent Answer :
: “RAW”:
RAW IS AN INDIAN INTILLIGENCE WING.
“RESEARCH AND ANALYSIS WING”
Ques:- What is aim?
Ques:- Frank is 15 years younger then John. In 5 years John will be twice as old as Frank. How old will Frank be in four years?
Recent Answer :
: 19
Ques:- The current of a stream runs at the rate of 4 kmph. A boat goes 6 km and back to the starting point in 2 hours, then find the speed of the boat in still water?
Ques:- If two cards are taken one after another without replacing from a pack of 52 cards what is the probability for the two cards be queen.
Recent Answer :
: 1/221
Ques:- A, B and C enter into a partnership. A invests some some at the beginning, B invests double the amount after 6 months and C invests thrice the amount after 8 months. If the annual profit be Rs.27,000, C’s share is
A. Rs. 11,250
B. Rs. 10,800
C. Rs. 9000
D. Rs. 8625
Recent Answer :
: c
Ques:- How to deal with customer?
Ques:- What do you know about us or our company?
Ques:- What were some of the things about your last job that you found most difficult to do?
Ques:- What should we expect from you. Should we choose to hire you for the post ?
Recent Answer :
: Question
Ques:- your aim is to become engineer then why join mba.
Ques:- What is present company name & work?
Ques:- A man can row at 5 kmph in still water. If the velocity of current is 1 kmph and it takes him 1 hour to row to a place and come back, Evaluate the distance of the place?
Ques:- Are you open to take risks? or Do you like experimenting?
Ques:- Why do you need this job ?
Ques:- The average age of 10 members of a committee is the same as it was 4 years ago, because an old member has been replaced by a young member. Find how much younger is the new member ?
Ques:- Please narrate your daily routine.
Ques:- How would you know you were successful on this job?
Ques:- Why ICICI not other banks
Ques:- If a 200 m long train crosses a platform of the same length as that of the train in 20 seconds, then the speed of the train is
A. 50 km/hr
B. 60 km/hr
C. 70 km/hr
D. 72 km/hr
Recent Answer :
: 3600 sec in 1 hr.. 1000 M in 1 km so to covert m/s to km /hr you multiply the value with (3000/1000) .. so 3000 divided by 1000 will give you 18/5 it’s like constant value.. to convert m/s to km/ hr we can use this 18/5.. hope you understand
Ques:- U have given 8 numbers 1,2,3,4,…8 arrange them in the given fig. such that adjacent numbers should not come in row/col/diagonal.
Ques:- The average mark of the students of a class in a particular exam is 80. If 5 students whose average mark in that exam is 40 are excluded, the average mark of the remaining will be 90. Find the number of students who wrote the exam?
Recent Answer :
: -Total /n=80
– x/5=40
x=200
Total/n=y/n
y-x/n-5=90
80n-200=90(n-5)
80n-200=90n-450
450-200=10n
n =25 (students) write exam
Ques:- What made u apply at their company?
Ques:- The sum of five numbers is 655. The average of the first two numbers is 85 and the third number is 125. Find the average of the two numbers?
Ques:- Explain the difference between group and team. Are you a team player?
Ques:- Where do u see urselfgoing in the next 5 years?
Ques:- Family background, personal details, etc.
Ques:- What is your typical way of dealing with conflict?
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.