7 Hr 30 Min
8days
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
65 KM
first fill 3quart pail and pour in 5quart pail.fill again 3
quart pail and fill remaining 2 quarts in 5 quart
pail.hence 1 quart remains in 3quart pail.empty 5quart pail
and pour 1 quart from 3 quart pail. also add another 3
quart from 3 quart pail. hence 1 + 3 quarts = 4 quarts.
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456
we consider a round shape cake.then cut in 2 equal parts in cut into center and next you have to cut its side by center then you have to get 8 equal parts in 3 exact cut
2.01
150
C. 20
Mr. Brown painted the first whole house in 6 days plus 1/3 of the second house in the next 2 days. Mr. Black can paint a whole house in 8 days and had 8 days to work, so he painted the equivalent of 1 whole house. That accounts for 2-1/3 houses painted. Mr. Blue only needs to paint 2/3 of the last house, so 2/3 times 12 days equals 8 days.
516 tones
#1: N = 1, f(N) = 1
#2: N = 199981, f(N) = 199981
#3: N = 199982, f(N) = 199982
#4: N = 199983, f(N) = 199983
#5: N = 199984, f(N) = 199984
#6: N = 199985, f(N) = 199985
#7: N = 199986, f(N) = 199986
#8: N = 199987, f(N) = 199987
#9: N = 199988, f(N) = 199988
#10: N = 199989, f(N) = 199989
#11: N = 199990, f(N) = 199990
#12: N = 200000, f(N) = 200000
#13: N = 200001, f(N) = 200001
#14: N = 1599981, f(N) = 1599981
#15: N = 1599982, f(N) = 1599982
20