- Winhms by winsar infosoft pvt ltd General Aptitude Interview Questions
- Winhms by winsar infosoft pvt ltd Trainee Interview Questions
- Winhms by winsar infosoft pvt ltd Personal Questions round Interview Questions
- Winhms by winsar infosoft pvt ltd HR Interview Questions
- Winhms by winsar infosoft pvt ltd Lead Interview Questions
x+y+z
—– = 6800
3
x>=6400
6400 + y + z = 20400
y + z = 14000
to get the greatest of y and z, lets assume y = 6400
so, z = 7600
so ANS is 7600
20×20+22×22+24×24= 1460
Numbers is less then 30 because 30 square is 900 we have to take three consecutive number if we take numbers greater than 30 the sum of that numbers wil be greater than 1460.
Relative speed = 60 + 90 = 150 km/hr.
= 150 x 5/18 = 125/3 m/sec.
Distance covered = 1.10 + 0.9 = 2 km = 2000 m.
Required time = 2000 x 3/125 = 48 sec.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
The 3-digit number can be written as the sequence [n, 2n, 3n]
n = 1 → [1, 2, 3] → valid
n = 2 → [2, 4, 6] → valid
n = 3 → [3, 6, 9] → valid
n = 4 → [4, 8, 12] is not valid because this would lead to a 4-digit number
any value of n > 4 would also produce invalid answer
Answer: Three numbers: {123, 246, 369}
to find the root of f(x) = 0;
1.26
3*12=36
transistor is a semiconductor device for amplifying ,controlling and generating the electrical signals.
Divide 30*60 seconds by LCM of Numbers =15