8925
20/- per day
So, if he work one day
So,1*20=20
1/3*20=20/3
2/3*20=40/3
1/8*20=5/2
3/4*20=15
so,
20+20/3+40/3+5/2+15=57.5
So ans is 57.5 is the ans
360
.
perimeter = pi(r) + 2r
= 19.782 + (12.6)
= 32.382 cm
let the 4 digit number be ABCD.
First Digit is A :
Therefore; according to the question
A=B/3
B=3A
C=A+B=A+3A=4A
D=3B=3(3A)=9A
Since the last Digit is D and it can neither be double-digit nor 0 ;
Therefore ;
A=1;
B=3A=3(1)=3
C=A+B=1+3=4
D=9A=9(1)=9
Therefore, the 4 digit number is 1349.
I think it’s none of these because Sunita is the grandmother of Renu so that makes the girl her mother in law ?
10%=394;50%=1970;250%=9850;30%=1182;
250%+30%=9850+1182=11032
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Mm
119