One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
previous ans wrong again..!!!!
first find x its 2 hours
total journey 6 hrs 3km up and also down
jill takes one hr to come down and jack takes 3 hrs so x
is 2 hours….
And while going up jack goes at 1.5km/hr and jill goes at
0.75 km hr so to travel 3 km they take 2 hrs and 4 hrs
respectively…!!! x again is 2 hrs…
so jack totally takes 5 hrs to travel 6 km
therfore speed is 6/5 km per hour
thats is 1.2 km per hour is the correct answer
A
By their Ability to suck dick.
CASE 1: First we should take six balls divided equally and
then it is placed on the two pans.three on one and three on
other..
if the two pans are balanced then the defective ball is not
in the six..then we should the two and keep them one ball
on each.
CASE2: Again We should take any of the six balls and
divided equally and then it is placed on the two pans.. if
any of the pan weighs less than the other.. We should take
the three balls seperately..Now from that three we should
take any two and placed one on each.. fi both the pan
balances the ball which is left over is the defective.. if
one ball weighes less than the other,while keeping one on
each,then it is the defective one….
Ans: 60 kph
Suppose Person meets the train everyday at 3 PM at Station A.
His speed is 12kph.
So normally he reaches 5 km before the meeting point (pt B) at (5/12 hr = 25 min before) 2:35PM.
But if he is late by 30 min, then he will reach that point (pt B) by 3:05 PM.
Train is traveling at its normal speed so it covers the distance of 5 Km in 5 min starting from Station A and reaches the meeting point (pt B) at 3:05 PM.
So speed of the train is 5KM/5min = 60 kph.
$560
If there are n bikes then the no. of people are 2n+1. n are dropped in firs trip, in second trip 3 bikes are unused, so 2n-3 + n covers 2n+1 people. i.e. n + 2n – 3 = 2n +1
n = 4
No. of people = 9
I will keep my dog far away from that allergic employee,for that I chain down my dog didn’t leave dog open to avoid moving the dog here there.
2nd
let t = total no of students.. then
students who passed one or both subjects,
n(e U h) = n(e) + n(h) – n(e intersection h)
=> t = 0.8t + 0.7t – 144
=> t = 1.5t – 144
students who failed both subjects is 10% i.e. 0.1t
=>t-n(e U h) = 0.1t,
=>t -(1.5t – 144) = 0.1t
=>t- 1.5t- 0.1t = -144
=> -0.6t = -144
=>t = 240