Ques:- Find the value of ( 0.75 * 0.75 * 0.75 – 0.001 ) / ( 0.75 * 0.75 – 0.075 + 0.01)
A. 0.845
B. 2.312
C. 1.908
D. 0
E. 1
Ques:- Tell me about any quality efforts you have overseen or implemented. Describe some of the challenges you faced and how you overcame them.
Ques:- P and Q invests Rs.10000 each, P investing for 8 months and Q investing for all the 12 months in the year. If the total profit at the end of the year is Rs.25000, find their shares?
Recent Answer : Added by Singaram On 2021-09-03 16:38:57:
10000*8:10000*12
2:3
5x=25000
x=5000
p:q
10000:15000
Ques:- How is my father’s mother’s only daughter-in-law’s sister related to me ?
Recent Answer : Added by Antonio On 2022-09-22 16:41:18:
mausi
Ques:- What can you do for us that someone else can’t?
Ques:- Would you prefer to stay with family or alone or colleagues?
Ques:- A, B, C and D playing cards. A and B are partners. D faces towards North. If A faces towards West, then who faces towards South?
Recent Answer : Added by Gladson On 2021-04-29 08:10:41:
C
Ques:- Assume that passwords are selected from four-character combinations of 26 alphabetic characters. Assume that an adversary is able to attempt passwords at a rate of one persecond.a) Assuming no feedback to the adversary until each attempt has been completed, what is the expected time to discover the correct password?
Ques:- The ratio between the school ages of Neelam and Shaan is 5:6 respectively. If the ratio between the one-third age of Neelam and half of Shaan’s age of 5:9, then what is the school age of Shaan?
Ques:- My family background.
Ques:- The edge of three cubes of metal is 3 dm, 4 dm and 5 dm. They are melted and formed into a single cube. Find the edge of the new cube?
Ques:- Why you left your previous company?
Ques:- . The place in India receiving the lowest rainfall is(1) Jaisalmer(2) Leh(3) Bikaner(4) Jodhpur
Recent Answer : Added by GAURAV WAGHELA On 2022-03-09 16:35:12:
Difference between 2 and 6 is = 4
Difference between 6 and 12 is = 6
Difference between 12 and 20 is = 8
Difference between 20 and 30 is = 10
Difference between 30 and 42 is = 12
Difference between 42 and 56 is = 14
So ne number will be with 16 Difference i .e 72
Therefore Answer will be 72
Ques:- What was your achievement with the previous company?
Ques:- Im aruna. im coming from Anagapathur near pallavaram. Now i studying in Bsc (IT) , annamalai university in chennai.
Ques:- What is the difference between deemed university & other university eg. DY Patil university (pune) & pune university
Ques:- There is a 4 inch cube painted on all sides. This is cut down into of 1 inch cubes. What is the no of cubes which have no pointed sides?
Ques:- Are you applying for other jobs also?
Ques:- What is the meaning of Allahabad bank logo?
Recent Answer : Added by Mahi On 2020-11-08 02:14:22:
Triveni Sangam of the river
Ganga, Yamuna, and Saraswati at Allahabad.
Ques:- How to prepare for interview?
Ques:- P, Q, R, S and T are five speakers who have to speak on a particular day, not necessarily in the same order. R is neither the first nor the last speaker. There are three speakers after S and three speakers ahead of T. If P speaks after Q, then who is the last speaker to speak?
Recent Answer : Added by narendra On 2021-12-25 15:45:41:
T is the last speaker.
Ques:- Give me an example of a time when you had to put your point across in a meeting to which most of the people were reluctant to hear.
Ques:- A man whose speed is 4.5 kmph in still water rows to a certain upstream point and back to the starting point in a river which flows at 1.5 kmph, find his average speed for the total journey?
Ques:- What types of tools or measuring devices do you use related to math?
Ques:- How long are you going to work with us?
Ques:- In what time will a train 100 m long cross an electric pole, it its speed be 144 km/hr?
Recent Answer : Added by Saiteja On 2021-07-29 16:19:16:
2.5 sec
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Ques:- Find the least number of five digits which is exactly divisible by 12, 15 and 18?
Ques:- Find the size of the largest square slabs which can be paved on the floor of a room 5 meters 44 cm long and 3 meters 74 cm broad?
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
10000*8:10000*12
2:3
5x=25000
x=5000
p:q
10000:15000