25
DISTANCE=TIME *SPEED
D=?
48*(5/18)=13.33m/s
D=9*13.333=120m
45
24*4= x(x+4)
solve this
answer is x=8
X+4= 12
Books=65+50=>115
Prices=1150+920=>2070
2070/115
18
60*5/18*9=150
10
1,50,000
answer :36
264
16 chapatis* 6 Rs= 96
5 plates of rice * 45 Rs = 225
7 plates of mixed vegetable * 70 Rs = 490
6 ice-cream * ??
The amount that Alok paid the cashier was Rs.961
96+225+490 = 811
961-811= 150
150/6 = 25
The cost of each ice-cream cup is 25 .Rs
“Since I’ve been working and gaining experience to get into this company, I’d like to stay a long time if I’m offered the job, since this is where I want to be. “ “As long as there’s a lot of work to do, then I’d be happy to stay for a long time. Since I’m a busybody, I like to being productive most of the time.”
270/(27*1000)*3600=36
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.