Blue
This is Expert Verified Answer
22 people found it helpful
author link
Lipimishra2
Expert
568 answers
113.9K people helped
Let the no. of men (originally) be x.
x no. of men require 10 days.
if however there were 10 men less it will take 10 days more for the work to be finished. ——> means x-10 men require 10+10=20 days.
10x = 20 (x-10)
x = 2x -20 => x = 20.
wake up guys and see modulo % can return only integer value.
So answer will be 1 and all other answers are wrong. You can
run your equation in C code and check the output.
I am looking for a qualified chartered accountant in my profile who is known for his excellence in the field.
X×x-x=272
X^2-x-272=0
(X-16) or (x-17)
X=16 or x=17
17^2-17=272
Answer Is 17
1000 cu.m
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
1/x
6 inch
8*1024+3*64+3
8192+192+3
8387
1000/0011/1000/0111
So ie 7. 1s here
Ratio is 3:2:1
Total=6
Reverse of ratio is 1/3:1/2:1/1
Portion of first part is=1/3*6=>2
Portion of second part is=1/2*6=>3
Portion of third part is 1*6=>6
∴So the new ratio is 2:3:6
If the bell rung when they r started is also counted then it
will be 5 otherwise 4