Find best Interview questions and answer for Tspi Job. Some people added Tspi interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Tspi Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Tspi interview or job.
This page contains the most recently asked technical questions and answers in the Tspi.
All of the questions listed below were collected by students recently placed at Tspi.
835, 734, 642, 751, 853, 981, 532
835,sum(digits)= 16
734 = 14
642=12
751= 13,
853=16,
981=18,
532=10
answer(c)751
( b ) ANGEME
2/3 * 15 miles = 10 miles then
time for 10 miles travel is t1 = 10/40 = 1/4
then remaning distance is 5 miles
time for 5 miles travel is t2 = 5/60 = 1/12
t1+ t2= 1/3 in seconds * 60 = 20 min
2^a = 2 x 2+a
a^3= 2 x a + 3
=> 4+a= 2a + 3
=> a = 1
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
(p*r*t)/100 = I ………………..(p*3*10)/100 = 840 …..p = 84000/30 = 2800
1896172