- Tavant technologies private limited General Aptitude Interview Questions
- Tavant technologies private limited Trainee Interview Questions
- Tavant technologies private limited Personal Questions round Interview Questions
- Tavant technologies private limited HR Interview Questions
- Tavant technologies private limited Lead Interview Questions
Placing three trees in triangle and placing the fourth tree in center
Suppose that total 100 employees are in company….. out of that 35 are man and remaining 65 are women.
20% of man 35 = 20*35/100
40% of women = 40*65/100
total employees = 7+26 = 33 out of 100
so, Ans = 33 %
3800
c
E non of those
white
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
3×8=24=2xt ===> t=12hours
The batsman on 98 is on strike. He hits the ball and they run 3. UNFORTUNATELY one of the batsmen doesn`t turn correctly for one of the runs and the umpire calls ONE SHORT and awards only two runs. Therefore the first batsman has his century. There is now 1 ball remaining and one run is required to win. The batsman on strike, however is now the one on 97 runs. He now either hits a 4 or a 6. They win the game and both batsmen scored centuries.
Read more: 3 runs required in 3 balls to win with only a wicket left. The batsmen is on 98 and the runner is on 97. How will both the batsmen score centuries … – 3 runs required in 3 balls to win with only a wicket left. The batsmen is on 98 and the runner is on 97. How will both the batsmen score centuries as well win the match ?