Spectrum healthcare Interview Questions, Process, and Tips

Ques:- If suppose you are selected in IBM with a package of 2.11 lacs p.a then suddenly you get an offer from other company with a package of 3 lacs for the same post. Then what will you do and which company will you prefer?
Ques:- When was the last occasion you asked for direct feedback from a superior or a customer? How did you then use this knowledge to improve your personal performance?
Ques:- A can run a kilometer race in 4 1/2 min while B can run same race in 5 min. How many meters start can A give B in a kilometer race, so that the race mat end in a dead heat?
Recent Answer : Added by Abhi Chatterjee On 2022-01-08 16:05:14:

A can give B (5 min – 4 1/2 min) = 30 sec start.
The distance covered by B in 5 min = 1000 m.
Distance covered in 30 sec = (1000 * 30)/300 = 100 m.
A can give B 100m start.

Ques:- Rayon is also known as?(a) Artificial Silk (b) Superfine Silk (c) Superfine Cotton(d) Blended Cotton
Recent Answer : Added by Sudeshna Roy On 2022-08-24 17:03:05:

Artificial silk

Ques:- A man rows to a place 48 km distant and come back in 14 hours. He finds that he can row 4 km with the stream in the same time as 3 km against the stream. The rate of the stream is:
Recent Answer : Added by shashank chourasiya On 2022-03-09 16:42:05:

Hint: Assume that the speed of the stream is x and the speed of the boat in still water is x. From the statement of the question form two equations in two variables x and y. This system is reducible to linear equations in two variables. Reduce the system to a system of linear equations in two variables by proper substitutions. Solve the system of equations using any one of the methods like Substitution method, elimination method, graphical method or using matrices. Hence find the value of x satisfying both the equation. The value of x will be the speed of the stream.
Complete step-by-step answer:
Let the speed of the stream be x, and the speed of the boat in still water be y.
We have the speed of the boat upstream = y-x.
Speed of the boat downstream = y+ x.
Now since it takes 14 hours to reach a place at a distance of 48 km and come back, we have the sum of the times taken to reach the place downstream and time taken to return back upstream is equal to 14.
Now, we know that time =Distance speed
Using, we get
Time taken to reach the place =48y+x and the time taken to return back =48y−x.
Hence, we have
48y+x+48y−x=14
Dividing both sides by 2, we get
24y+x+24y−x=7 —–(i)
Also, the time taken to cover 4km downstream is equal to the time taken to cover 3km upstream.
Hence, we have 4y+x=3y−x
Transposing the term on RHS to LHS, we get
4y+x−3y−x=0 ——– (ii)
Put 1y+x=t and 1y−x=u, we have
24t+24u=7 ——-(iii)4t−3u=0 ——–(iv)
Multiplying equation (iv) by 6 and subtracting from equation (iii), we get
24t−24t+24u+18u=7⇒42u=7
Dividing both sides by 42, we get
u=742=16
Substituting the value of u in equation (iv), we get
4t−3(16)=0⇒4t−12=0
Adding 12 on both sides, we get
4t=12
Dividing both sides by 4, we get
t=18
Reverting to original variables, we have
1y+x=18 and 1y−x=16
Taking reciprocals on both sides in both equations, we have
y+ x=8 ——- (v)y−x=6 ——–(vi)
Adding equation (v) and equation (vi), we get
2y=14
Dividing both sides by 2, we get
y=7.
Substituting the value of y in equation (v), we get
7+x=8
Subtracting 7 from both sides we get
x = 8-7 =1
Hence the speed of the stream is 1 km/hr.

Ques:- In front of you are 10 bags, filled with marbles. The number of marbles in each bag differs, but all bags contain ten marbles or more. Nine of the ten bags only contain marbles of 10 grams each. One bag only contains marbles of 9 grams. In addition, you have a balance which can weigh in grams accurate, and you are allowed to use it only once (i.e. weigh a single time). How can you find out in one weighing, which bag contains the marbles of 9 grams?
Ques:- A company bought a total of 60 computers and 20 printers to modernise billing operations. If the price of each computer was three times the price of each printer, what percent of the total cost of the purchase was the total cost of the printer?
A. 10%
B. 11%
C. 15%
D. 20%
Recent Answer : Added by whocares On 2022-08-14 16:32:07:

Ans is 10%

Printer price = x;
Computer price = 3x
Total overall price = 20x + 60 x 3x = 200x

Printer percent = (20x/200x ) x 100 = 10%

Ques:- The average weight of a group of boys is 30 kg. After a boy of weight 35 kg joins the group, the average weight of the group goes up by 1 kg. Find the number of boys in the group originally ?
Recent Answer : Added by Vivek verma On 2021-08-25 14:15:38:

let no of boys in group is = x
then total sum = 30 * x
after joining one more boys with a weight of 35 kg the total sum is = 30x + 35
after joining the new student the weight will increase 1 kg
so total sum
30x + 35 = 31(x+1)
x = 4

Ques:- You have been given sand time clocks of 4 and 7 minutes. How to measure 9 minutes?
Recent Answer : Added by LeoOooO On 2022-08-14 16:25:34:

7 min clock:|——-7——-|
4 min clock:|—–4—-|—-4—–|—–4—-|—–4—-|
you got 9 min: |—————9————–|

Ques:- A man bought a horse and a cart. If he sold the horse at 10 % loss and the cart at 20 % gain, he would not lose anything; but if he sold the horse at 5% loss and the cart at 5% gain, he would lose Rs. 10 in the bargain. The amount paid by him was Rs.- _______ for the horse and Rs.________ for the cart.
Ques:- Nanda Devi peak forms a part of(a) Assam Himalayas(b) Kumaon Himalayas(c) Nepal Himalayas(d) Punjab Himalayas
Ques:- Currently, the age of a father is three times that of his son. 2.5 years from now, age of the father becomes 2.5 times that of the son. The age of son currently is?
Recent Answer : Added by Bhagirathi H On 2022-09-15 16:37:05:

Fathers before age=3*before sons age—-(1)
After 2.5 years..
Fathers before age+2.5 years =2.5*sons age—-(2)
Substitute (1) in (2),
3*sons before age+2.5 years=2.5*sons age
0.5*sons age=2.5 years
Sons before age=5years
So current age after 2.5 years,
Sons before age+2.5 =5+2.5=7.5 years

Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:

To solve this problem, we can break it down into steps:

Step 1: Determine the individual rates of work for A, B, and C.

If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.

Step 2: Calculate the combined work rate of A and B.

If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.

Step 3: Calculate the time it takes for B to complete 75% of the task.

Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.

Step 4: Calculate the remaining work for C.

If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.

Step 5: Calculate the time it takes for C to complete the remaining work.

Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.

Step 6: Calculate the total time required.

A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.

Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.

Ques:- What are your salary expectations?
Ques:- “A soldier loses his way in a thick jungle. At random he walks from his camp but mathematically in an interesting fashion. First he walks one mile East then half mile to North. Then 1/4 mile to West, then 1/8 mile to South and so on making a loop.. Finally how far he is from his camp and in which direction. ..”
Recent Answer : Added by Harsh Shah On 2021-07-22 15:55:58:

Soldier have to move 0.75 miles to West and then 0.375 miles to South to reach the camp.
How:-
Firstly soldier moving 1 mile to East from camp and then 1/2 miles= 0.50 miles to North .

Then it is moving 1/4 miles =0.25 miles to west
And then 1/8 miles =0.125 miles to South

Now we just have to count the difference and minus the value of camp to East with the value of North to west = 1mile – 0.25miles(1/4) = 0.75 miles

Same case with north and south = 0.50 miles(1/2) – 0.125 miles(1/8) = 0.375 miles

Hence proves to return camp the soldier have to move 0.75 miles to west and 0.375 miles to south

Ques:- You have a biased coin in which the probability of getting a head is 51%. Create an event out of this coin which has a probability of 25%.
Ques:- Tell me about ur self.
Ques:- In 1991, was the number of people in City A three times greater then the number of people in City B?
Recent Answer : Added by Admin On 2020-05-17 12:05:21:

question is incomplete

Ques:- 10,9,60,90,70,66,?
Recent Answer : Added by Babuji On 2020-09-29 04:17:01:

ans 810 i think

Ques:- Tell me something about our company.
Ques:- How will you manage, being a fresher?
Ques:- Can you work well in a team? Please share some of your strategies for executing good team work?
Ques:- Tell me about yorself?
Ques:- What would u looking in your job ?
Ques:- P and Q start a business with Rs.6000 and Rs.8000 respectively. Hoe should they share their profits at the end of one year?
Recent Answer : Added by REGULLA RAJU On 2022-12-20 12:54:08:

Explanation:
They should share the profits in the ratio of their investments.
The ratio of the investments made by A and B =
6000 : 8000 => 3:4

Ques:- Today is Tuesday. After 62 days it will be
A. Monday
B. Wednesday
C. Thursday
D. Sunday
Recent Answer : Added by Shankar On 2021-11-09 15:53:20:

Monday
7days for a week so 62÷7 remainder is 6 so
After Tuesday + 6days = monday

Ques:- Whatdid you do yesterday?
Ques:- Why you want to change your current job
Ques:- What is your project in Engineering?
Ques:- Murali travelled from city A to city B at a speed of 40 kmph and from city B to city C at 60 kmph. What is the average speed of Murali from A to C given that the ratio of distances between A to B and B to C is 2 : 3?
Recent Answer : Added by DK BOSS On 2021-07-17 06:18:20:

Answer: 50 kmph.

Explanation:

Let the distances between city A to B and B to C be 2x km and 3x km respectively.

Total time taken to cover from A to C
= (2x)/40 + (3x)/60 = (6x + 6x)/120 = 12x/120 = x/10 Average speed = (2x + 3x)/(x/10) = 50 kmph.

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top