To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Let three consecutive even numbers be 2n,2n+2,2n+4
product=2n(2n+2)(2n+4)
If n=1,
product =2(4)(6)=48.
So, all the numbers will be divisible by 48 if change n.
LCM of 4,6,8 and 10 are 120
So, the least number of four digits is 120*9=1080 ( <1000 )
x/2y=3/2…
therefore
2x=6y
x=3y
therefor
=21y+4y/3y-2y
=25y/y
=25..
there answer=25
so for the above question, we don’t have an option…so answer
is Data Insufficient..
I think U r wrong Tina,because
according to u,
1st customer=43 apples
2nd customer=21.5 apples
An apple cannot be cut
I think the answer is 127 check it out…
12
Since the car has met the person 20 minutes beforehand, it has saved 10 mins of a journey
A man has started 1.30 hrs before and the car has met him 10 mins before the actual time, he takes to reach daily is 1hr and 20 mins
4
I keep myself connected to social networking sites, the first platform for any technological advancement news and also keep surfing on the latest technology on the internet”. You can even say that you are connected to professional people from different media and have a continuing conversation with them regarding the growing technologies.