Find best Interview questions and answer for Mathis brothers furniture Job. Some people added Mathis brothers furniture interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Mathis brothers furniture Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Mathis brothers furniture interview or job.
This page contains the most recently asked technical questions and answers in the Mathis brothers furniture.
All of the questions listed below were collected by students recently placed at Mathis brothers furniture.
- General Aptitude Interview Questions of Mathis brothers furniture
- Trainee Interview Questions of Mathis brothers furniture
- Personal Questions round Interview Questions of Mathis brothers furniture
- HR Interview Questions of Mathis brothers furniture
- Lead Interview Questions of Mathis brothers furniture
17 secs
31
cos
434-403=31
465-434=31
b
8:20
Your donation keeps our website running smoothly and accessible to all. Support us today to ensure we continue to provide valuable information and resources.

414 Rs
1.2*37.8=45.36=46 sq.feet
46*9=414 RS
I’m the capable of what u expect from me and you should say what is the tallent u have which is used for that company…🥰
Day 1: 30-3ft = 27+2ft = 29
Day 8: 23 jumps 3ft = 20 slips 2ft = 22
Day 16: 13 jumps 3ft = 10 slips 2ft = 12
Day 24: 3 jumps 3ft = Out?
16
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
D=150+300=450 mt.
speed = distance/time
speed = 450/(40.5/3600)
speed =40,000 mt/sec