16, 32, 64, 81, 100, 144, 190
First nos series is 7,9,11,?
ie odd number siries ie 7,9,11,13
Second number series is 16,15,14
ie 1 less the previous number 16,15,14,13
Ans —-series is 7,16,9,15,11,14,13,13
Lets call the 5 litre jug as jug A and 3 litre jug as jug B. Now, follow the steps:
Fill jug A completely. Now it contains 5 litres.
Slowly pour the water from jug A to jug B until jug B is completely filled. Now, jug A contains 2 litres and jug B contains 3 litres.
Throw away the water in jug B so that it is completely empty. Now, jug A contains 2 litres and jug B is empty.
Transfer the water from jug A to jug B. Now, jug A is empty and jug B contains 2 litres.
Fill jug A completely. Now, jug A contains 5 litres and jug B contains 2 litres.
Transfer water from jug A to jug B until jug B is completely filled. Now, jug A contains 4 litres and jug B contains 3 litres.
Now you have 4 litres of water in jug A.
The answer is depend on the distance between Mysore &
Bangalore which is not given in the question.Bird
travel=Distance/35*25km
3, 7, 15, 27, 63, 127, 255
B. 27
( Number × 2 ) + 1
3 × 2 + 1 = 7
7 × 2 + 1 = 15
15 × 2 + 1 = 31 ( not 27 )
31 × 2 + 1 = 63
63 × 2 + 1 = 127
127 × 2 + 1 = 255
Prob(choosing two people who are a couple from 6 couples) = 1/6
We have 5 couple left (10 people)
Prob(choosing a person A from 10 people) = 1/10
Prob(choosing 1 person who is not a couple of A) = 1/8
Prob(choosing 4 people that has exactly one couple) = 1/6*1/8*1/10 = 0.0021
40358
4500 sal of jan
A & B one day work= 1/18 + 1/30= 8/90
As we know that number of work is 1
1÷8/90= 1*90/8= 90/8.
Since they say “ twice the amount of work
Then ,2*90/8= 22.5 days
A=P+SI——(1)
sum of money after 30 years = Double the money
A=2P———-(2)
Equate 1 and 2
P+SI=2P
SI=2P-P
SI=P————-(3)
WKT, SI= PTR/100
Equate 3 and SI
P=PTR/100
P=P*30*R/100
R=P*100/P*30
R=100/30 or 10/3 or 3(1/3) %
7:3
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
no
avg sal of 3 is $950
first person earns=$1150
second person earns=$650
let thirdperson =x
avg=(1150+650+x)/3
950*3=1800+x
x=2850-1800
x=$1050
1056/(2*pi*r)=1056/(2*3.14*14)=1059/88 =12 revolution
Perimeter of semi circular = πr+2r
Where r is radius , π = 22/7
πr+2r= 144 (given)
(22/7)r +2r = 144
22r+14r = 144*7 (multiply both sides by 7)
36r = 144*7
r= 144*7/36 = 28
radius =28 cm
Area =( 1/2)πr^2
Area=( 1/2 )*(22/7)*28*28
= 1232cm^2
Ans : area is 1232 cm^2
36