- Kpr institute of engineering and technology General Aptitude Interview Questions
- Kpr institute of engineering and technology Trainee Interview Questions
- Kpr institute of engineering and technology Personal Questions round Interview Questions
- Kpr institute of engineering and technology HR Interview Questions
- Kpr institute of engineering and technology Lead Interview Questions
Ques:- A train passes two cars moving in the direction at 45km/hr and 50km/hr in 36 sec and 54 sec respectively. What is the length of the train?
Ques:- A certain sum becomes Rs. 20720 in four years and 24080 in six years at simple interest. Find sum and rate of interest?
Ques:- Why do you want to work for CL?
Ques:- How many member in your family and where is your father working?
Ques:- About Job need
Ques:- Find the cost of fencing around a circular field of diameter 28 m at the rate of Rs.1.50 a meter?
Ques:- Find out the wrong number in the series:
10, 25, 56, 70, 85, 95, 125
10, 25, 56, 70, 85, 95, 125
A. 10
B. 56
C. 85
D. 125
Recent Answer :
: 56
Ques:- If a: b = 3:4, b:c = 7:9, c:d = 5:7, Evaluate a:d?
Recent Answer :
: 3:7
Ques:- Of your creative accomplishments big or small , at work or home, what gave you the most satisfaction?
Ques:- A can do a job in 18 days and B can do it in 30 days. A and B working together will finish twice the amount of work in ——- days?
Recent Answer :
: A & B one day work= 1/18 + 1/30= 8/90
As we know that number of work is 1
1÷8/90= 1*90/8= 90/8.
Since they say “ twice the amount of work
Then ,2*90/8= 22.5 days
Ques:- Six points are marked on a straight line and five points are marked on another line which is parallel to the first line. How many straight lines, including the first two, can be formed with these points?
Recent Answer :
: 30+2=32
Ques:- if the sum of five consecutive nos. 35? how many prime nos are there ?
Recent Answer :
: 5 + 6 + 7 + 8 + 9 = 35 so two primes 5 and 7.
Ques:- A 31″ x 31″ square metal plate needs to be fixed by a carpenter on to a wooden board. The carpenter uses nails all along the edges of the square such that there are 32 nails on each side of the square. Each nail is at the same distance from the neighboring nails. How many nails does the carpenter use?Â
Recent Answer :
: 124
Ques:- What changes would you make if you came on board?
Ques:- Tell me about something you did ? or failed to do ? that you now feel a little ashamed of.
Ques:- The premium fashion brand Morgan De Toi, recentlylaunched in India, belongs to which country?
A. Japan
B. Italy
C. USA
D. France
Recent Answer :
: France — D
Ques:- 3 persons started placementpapers with a capital of Rs.3000 . B invest Rs.600 less than A, C invest Rs.300 less than B. Then what is the share amount of B in a profit of Rs.886 ?
Recent Answer :
: Rs.265.80
Ques:- Some electrical engineering technical queston and some persnal data and completed project details.
Ques:- DESCRIBE A FAILURE IN PROFESSIONAL OR ACADEMIC LIFE?HOW TO OVERCOME
Ques:- Why do I want to join this bank?
Ques:- If 1.5x=0.04y then the value of (y-x)/(y+x) is ?
Ques:- ABOUT ME, QUALIFICATION EXPERIENCE.
Ques:- Who is your Favorite Musician
Ques:- Who is first muslim president of india?who is first ethinc indian women in space?
Ques:- A pipe can fill a tank in 30 min B can fill in 28 min then if 3/4 th of tank can be filled by B pipe and after wards both are opened then how much time is required by both the pipes to fill the tank completely.
Recent Answer :
: 105/29 mins
Ques:- Give me an example of a time when you had to put your point across in a meeting to which most of the people were reluctant to hear.
Ques:- A bundle of balloons contains 12 packets and there are 24 bundles in a box. The retail price of a packet of balloons is given by the user and calculate the price of such 5 boxes.
Ques:- to travel ‘m’ miles the time is ‘h’ hours,then what is the time taken to travel M miles.
Recent Answer :
: speed=mile/hour
.•. time taken to travel M miles is
So, time =distance/speed
=M/m/h
=Mh/m hrs
Ques:- How do you feel working under pressure?
Ques:- The average salary of 3 workers is 95 Rs. per week. If one earns Rs.115 and second earns Rs.65 how much is the salary of the 3rd worker.
Recent Answer :
: (115+65+x)/3=95
x=105
In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132