Ques:- If a boat is moving in upstream with velocity of 14 km/hr and goes downstream with a velocity of 40 km/hr, then what is the speed of the stream ?(a) 13 km/hr(b) 26 km/hr(c) 34 km/hr(d) none of these
Recent Answer : Added by DRS On 2022-08-14 16:31:31:
Speed of Stream = 1/2 (Downstream Speed – Upstream Speed)
=1/2(40-14)
=1/2(26)
=13km/h
method 2:
for down stream case :speed=Boat speed + Stream speed
for up stream case :speed=Boat speed – Stream speed
therefore, Bs + Ss =40
Bs – Ss =14
(-) (-) (-)
———————
2Ss=26
Ss=26/2 = 13Km/h
Stream speed= 13Km/hr
Ques:- A speed of 14 metres per second is the same as
A. 28 km/hr
B. 50.4 km/hr
C. 70 km/hr
D. 74.2 km/hr
Recent Answer : Added by M KISHORE On 2023-03-15 16:31:05:
let convert meter to kilometer by multiply 18/5 then answer be 14*(18/5)=50.4 km/s
Ques:- Friday Dressing is a label of which Apparel Brand?
Ques:- Below is an equation that isn't correct yet. By adding a number of plus signs and minus signs between the ciphers on the left side (without changes the order of the ciphers), the equation can be made correct. 123456789 = 100 How many different ways are there to make the equation correct?
Ques:- Why do you want to work in this industry?
Ques:- What is the sum of two consecutive even numbers, the difference of whose squares is 84?
Recent Answer : Added by Admin On 2022-09-29 16:21:46:
Let the numbers be x and x + 2.
Then, (x + 2)2 – x2 = 84
⇒ 4x + 4 = 84
⇒ 4x = 80
⇒ x = 20.
∴ The required sum
= x + (x + 2)
= 2x + 2
= 42
Ques:- If the sides of two cubes are in the ratio 3: 1 the ratio of their total surface area is?
Ques:- How do you motivate your team members?
Ques:- Please Introduce yourself
Ques:- The time taken by a train 180 m long, travelling at 42 kmph, in pasing a person walking in the same direction at 6 kmph, will be
A. 16 sec
B. 18 sec
C. 21 sec
D. 24 sec
Recent Answer : Added by SHOWMINI R On 2022-08-14 16:29:07:
D = 180m
S = 42 – 6 = 36 * 5/18 = 10
T = D/S = 180/10
T = 18s
Ques:- Tell me about a suggestion you have made?
Ques:- What are your interests?
Ques:- Why you left your last job?
Ques:- 1.What are your significant functional achievements in the present company? How did they contribute to the total process
Ques:- Tell me something about your last job, other than money, that would have inspired you to keep working there?
Ques:- About my self, regarding customer service.
Ques:- What is artificial memory?
Ques:- Tell me about your achievements in last 5 years?
Ques:- A motorcyclist goes from Bombay to Pune, a distance of 192 kms at an average of 32 kmph speed. Another man starts from Bombay by car 2 ½ hours after the first, and reaches Pune ½ hour earlier. What is the ratio of the speed of the motorcycle and the car?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Ques:- 9 men and 12 boys finish a job in 12 days, 12 men and 12 boys finish it in 10 days. 10 men and 10 boys shall finish it in how many days?
Recent Answer : Added by MyDotcollection On 2022-03-09 16:42:06:
8days
Ques:- How do you estimate staff requirements?
Ques:- How to achieve growth in marketing?
Ques:- How did you come to know about this opportunity?
Ques:- What was the most stressful aspect of your last project and how did you deal with it?
Ques:- A sum of money lent out at S.I. amounts to Rs. 720 after 2 years and to Rs. 1020 after a further period of 5 years. The sum is?
Recent Answer : Added by Aishwarya Gupta On 2020-11-17 15:27:28:
600
Ques:- Find the greatest number of four digits which when divided by 10, 15, 21 and 28 leaves 4, 9, 15 and 22 as remainders respectively?
Recent Answer : Added by saikiran On 2022-08-24 17:03:44:
9654
Ques:- At a game of billiards, A can give B 15 points in 60 and A can give C to 20 points in 60. How many points can B give C in a game of 90?
Ques:- A cistern is filled by a tap in 3 1/2 hours. Due to leak in the bottom of the cistern, it takes half an hour longer to fill the cistern. If the cistern is full how long will it take the leak to empty it?
Ques:- 1/8 is devided by ‘s’ , if ‘s’ is incresed by 2 times, what is the result?
Recent Answer : Added by Admin On 2020-05-17 12:00:00:
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
Speed of Stream = 1/2 (Downstream Speed – Upstream Speed)
=1/2(40-14)
=1/2(26)
=13km/h
method 2:
for down stream case :speed=Boat speed + Stream speed
for up stream case :speed=Boat speed – Stream speed
therefore, Bs + Ss =40
Bs – Ss =14
(-) (-) (-)
———————
2Ss=26
Ss=26/2 = 13Km/h
Stream speed= 13Km/hr