- Hpc hamburg port consulting gmbh General Aptitude Interview Questions
- Hpc hamburg port consulting gmbh Trainee Interview Questions
- Hpc hamburg port consulting gmbh Personal Questions round Interview Questions
- Hpc hamburg port consulting gmbh HR Interview Questions
- Hpc hamburg port consulting gmbh Lead Interview Questions
it is based on the right shift operation on the perticular digit
let the speed limit be x.
speed by first rider S1 and 2nd rider be S2.
S1=x+10;
ans S2=x+2*10; and given S2=35.
solving we get x=15mph.
In this question only one data is given ie., hole length - 6". In the question there is no mistake.
Find the answer.
volume of a sphere is 4/3 * pi * r^3
by drilling a hole 6 inches long the volume of the sphere is
not affected bcos the hole is a 1 dimension quantity..(say a
straight line) n so it does not have any value w.r.t volume…
hence the volume of the sphere does not change..
Grandma
80
9
Assum that the lables are : mixture, apples and orange
we have to take out one fruit from the mixture basket an see:
if it’s an apple –
it means that this basket is filled with apples
and so, the third basket is mixture
and the second one is filled with oranges.
if it’s an orange –
it means that this basket is filled with oranges
and so, the second basket is mixture
and the third one is filled with apples.
By 1hour both trains meet, so the distance travel by fly in
1hr is 120km.
1km is equal to 1000 meter
Therefore 225 meter is how many km
Then we have to cross multiply
1km – 1000 meter
? – 225 meter
0.225 km
Then we have to apply formula
Speed = Distance/Time
Speed = 0.225/12 sec
= 0.01875×3600sec
= 67.5
Therefore speed of train is = 67.5
Fuel to go = x + (x/4)=5x/4
Fuel to come = x
now,
x+(5x/4) = 4.5
9x/4 = 4.5
9x = 18
x = 2 (Fuel to comeup)
Fuel to go will be:
2+(2/4) = 2 + (0.5) = 2.5
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
gujarat