1.5 hr
1997
acno is right answer
if am standing on a ballconi so i see the people what they
are doing and how they are handling with the people and
what they are taking to each and everybody.
9 and 16
5, 10, 13, 26, 29, 58, 61, (…..)
122
Lets assume total LCM(5,8) = 40units.
As, 5 men or 8 women do equal amount of work in a day,
1 Man does 8units/day and 1 Woman does 5units/day.
3M and 5W in 10 days do (3*8 + 5*5)*10 = 490units
To do 490 units in 14 days, number of Women required = 490/(14*5) = 7
(x+2)^2 -x^2 = 84
X=20
So (20,22)
Sum= 42
Prob(choosing two people who are a couple from 6 couples) = 1/6
We have 5 couple left (10 people)
Prob(choosing a person A from 10 people) = 1/10
Prob(choosing 1 person who is not a couple of A) = 1/8
Prob(choosing 4 people that has exactly one couple) = 1/6*1/8*1/10 = 0.0021
43.69
Because the total distance will be =100+80000m=80100m. Thus two train coming towards, so the speed will be increase. speed will be =60+50=110km/h, The time of crossing will be 43.69 minutes.
Suppose the lengthier arm of weighing pan is of x cm and other arm is y cm .Also let weight if each melon be m kg.
so applying equilibrium of torque principles ,we get
case 1:-
1x-8my=0
case 2:-
2mx-1y=0
using case 1 equation , we substitute value of x into case 2 equation;
16mmy-1y=0
(16mm-1)y=0
y is length of weighing arm and cannot be 0,
therefore ,
16mm-1 =0
16mm=1
mm=1/16
m= square root (1/16)
m=+-1/4
m is weight of melon and cant be negative.
Hence m, weight of one melon is 1/4 kg
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
D
Initially (2*33 + 1*24)/(2+1) = 30p a gm
So, cost for 100g = 100*30 = 3000p
Later, (1*33 + 2*24)/(1+2) = 71/3 p a gm.
So, cost for 100g = 100*(71/3) = 2366.67p
He saves 3000 – 2366.67 = 633.33p
Concept of weighted average.
8, 27, 64, 100, 125, 216, 343
100
5 litre jug contains 4 litres of salt water solution
with 15% of salt, that means it has 4000*.15 = 600 ml salt
in it.
If 1.5 litres solution is spills out, remaining solution
is 2.5 litres, then the salf content is 2500*.15 = 375ml.
Now, the jug is filled to full capacity with water i.e.,
now the jug has 5 litre solution in it.
Now, the salt content is 375/5000 = 7.5%