- CACEIS Bank Luxembourg Branch General Aptitude Interview Questions
- CACEIS Bank Luxembourg Branch Trainee Interview Questions
- CACEIS Bank Luxembourg Branch Personal Questions round Interview Questions
- CACEIS Bank Luxembourg Branch HR Interview Questions
- CACEIS Bank Luxembourg Branch Lead Interview Questions
16, 32, 64, 81, 100, 144, 190
1600 years contain 0 odd day.
300 years contain 1 odd day.
94 years = (23 leap years + 71 ordinary years)
= (46 + 71) odd days
= 117 odd days, i.e., 5 odd days
Days from 1st January 1995 to 28th February 1995
= (31 + 28) days = 59 days
= (8 weeks + 3 days) = 3 odd days
∴ Total number of odd days
= (0 + 1 + 5 + 3) = 9 odd days i.e., 2 odd days.
So, the required day is Tuesday.
Doug won the race
Explanation-
The ratio of steps covered by me, Doug, and Anne is = 6:7:8
Since Distance covered in Me 21 steps = Distance covered by Doug 24 steps = Distance covered by Anne 28 steps
LCM (21, 24, 28) = 168
For a distance of 168 units, the ratio of the distance covered in each step is;
= 8 : 7 : 6
Therefore the ratio of speeds is;
= 8×6: 7×7: 6×8
= 48 : 49 : 48
Here, the speed of the Doug is more than the speed of me and Anne
Hence, Doug won the race
Out of 800 cheques 100 are for data processing.
Out of 16000 cheques = (100/800)*16,000 = 2000 cheques
the capital of India is New Delhi
the capital of Pakistan is Islamabad
the ans is(b)Islamabad
34
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
There should be 5(2+2+1) decimal places in the answer and the decimal place should end with 2(3*2*2=12) so the correct answer is a, no need for calculator. You can rule out all the other options because it does not satisfy this condition.
36