0.000256
(999)2-(998)2
=998001-996004
=1997
X×x-x=272
X^2-x-272=0
(X-16) or (x-17)
X=16 or x=17
17^2-17=272
Answer Is 17
x (A to B by car) + y (B to A by cycle) is 7 hours
x (A to B by car) + x (B to A by car) is 7 minus 3 is 4 hours
2x is 4 and hence x is 2
2 + y is 7 and hence y is 5
y (A to B by cycle) + y (B to A by cycle) is 5 + 5 is 10 hours
find out what is the problem and taking the bad out always works.
Let the number of one rupee coins in the bag be x.
Number of 50 paise coins in the bag is 93 – x.
Total value of coins
[100x + 50(93 – x)]paise = 5600 paise
=> x = 74
ANS = 74
40
10%
previous ans wrong again..!!!!
first find x its 2 hours
total journey 6 hrs 3km up and also down
jill takes one hr to come down and jack takes 3 hrs so x
is 2 hours….
And while going up jack goes at 1.5km/hr and jill goes at
0.75 km hr so to travel 3 km they take 2 hrs and 4 hrs
respectively…!!! x again is 2 hrs…
so jack totally takes 5 hrs to travel 6 km
therfore speed is 6/5 km per hour
thats is 1.2 km per hour is the correct answer
451 times.
Explanation: There are 60 minutes in an hour.
In ¾ of an hour there are (60 * ¾) minutes = 45 minutes.
In ¾ of an hour there are (60 * 45) seconds = 2700 seconds.
Light flashed for every 6 seconds.
In 2700 seconds 2700/6 = 450 times.
The count start after the first flash, the light will
flashes 451 times in ¾ of an hour.
Let the distance between each pole be x m. Then, distance up to 12th pole = 11x m
∴ Speed = 11x22m/s
∴ Time to cover total distance up to 20th pole
= 19x×2411x
= 41.45 s
1121221
A
Burn Rope One first, it will burn in 30 mins.Mark 30 mins and at the end of 30 mins now burn second rope from both sides (15 mins it will take ),and simultaneously burn third and last rope until it is half left.30+15= 45 , Remaining time 7.5 mins.By this time last rope is burnt half ,and now burn it from both sides as well it will exhaust in 7.5 mins. 30+15+7.5=52.5 measured.
24000
10C3 = 120
Time taken to fill repaired cistern = 12 mins
In 1 min, pipe will fill = 1/12
Time taken to fill cistern with leak = 12 + 18 = 30 mins
In 1 min, it will fill = 1/30
Consider the leak as an outlet pipe, so
1/30 = 1/12 – [ in 1 min how much the outlet pipe leaks ]
= 1/12 – 1/30
= 5/60 – 2/60 = 3/60 = 1/20
Therefore, it will take 20 mins for the leak to empty the cistern
as i assume the time taken to complete the job is not to be
changed while increasing the employees as it does not
clearly states so……….
30 men wrk for 9 hrs
therefore for the work to be done if no of workers is
increases the no of hrs / day to work should decrease so
here s a inverse relation
solving further we get
30 = K /9 ==> K= 270
now
40 = 270/y ==> y= 6.75
therefore ans is d)none