- Australian department of home affairs General Aptitude Interview Questions
- Australian department of home affairs Trainee Interview Questions
- Australian department of home affairs Personal Questions round Interview Questions
- Australian department of home affairs HR Interview Questions
- Australian department of home affairs Lead Interview Questions
3500*10/100
3500*11.5/100 = 402.5 per year
402.5×3 = R1207.5
BBMEHE
6084
7431 is largest number and 1347 is the least number from digits 1,3,4,7
so 7431-1347=6084
2:1
I will first need to understand why he/she behaves so to establish the exact cause and try persuade him to appreciate roles and responsibilities of the various Team members in trying to achieve organizational goals.
4
D also increases
D & T are directly proportional
When A runs 1000 meters, B runs 900 meters and when B runs 800 meters, C runs 700 meters.
Therefore, when B runs 900 meters, the distance that C runs = (900 x 700)/800 = 6300/8 = 787.5 meters.
So, in a race of 1000 meters, A beats C by (1000 – 787.5) = 212.5 meters to C.
So, in a race of 600 meters, the number of meters by Which A beats C = (600 x 212.5)/1000 = 127.5 meters.
Let water and milk be in x quantity
3x+2x=125
5x=125
x=25
Milk=3x=75litre
Water=2x=50litre
2x=50litre
4x=100litre
So 50 litre more should be added so that the ratio becomes 3:4
11 14
12 15
13 16
=======
14 17
the answers is 14
Time =9 seconds
Speed =(60×518) m/sec=(503)m/sec
∴ Speed =DistanceTime
Length of the train (Distance) = (Speed × Time) = (503×9) m=150 m.
C
99/1020
26
just will draw the line first and then draw three concentric circles
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
7 : 3
Cousin
I’m the capable of what u expect from me and you should say what is the tallent u have which is used for that company…🥰