- Western health and social care trust General Aptitude Interview Questions
- Western health and social care trust Trainee Interview Questions
- Western health and social care trust Personal Questions round Interview Questions
- Western health and social care trust HR Interview Questions
- Western health and social care trust Lead Interview Questions
2380
Explanation:
The number of ways of selecting three men, two women and three children is:
= ⁴C₃ * ⁶C₂ * ⁵C₃
= (4 * 3 * 2)/(3 * 2 * 1) * (6 * 5)/(2 * 1) * (5 * 4 * 3)/(3 * 2 * 1)
= 4 * 15 * 10
= 600 ways.
Rs. 1500
a) 90
b) 36
c) 56
d) 6
e) 140
f) 20
g) 30
H) 40 because u need to take in account the people that
done like any of the music maybe they like techno?
Servlets are faster as compared to JSP, as they have a short response time.
JSP is slower than Servlets – JSP is a HTML-based codes.
Servlets are harder to code, as here, the HTML codes are written in Java – JSPs are easier to code, as here Java is coded in HTML.
In an MVC architecture, Servlets act as the controllers. – In MVC architectures, the JSPs act as a view to present the output to the users.
The service() function can be overridden in Servlets. – The service() function cannot be overridden in JSPs.
Ans. 175
Relative speed in m/s=40-22=18X5/18=5m/s
Total distance=125+x m
T=1min=60 s
D=sXt
125+x=5X60
x=175
If both agree stating the same fact, either both of them speak truth of both speak false.
∴ Probability
=3/5×4/7+2/5×3/7=12/35+6/35=18/35
c
Hard work would mean spending long hours to complete my work without any shortcuts. It definitely ensures results but the process is long and stressful. Smart work would be aiming for the same results but with planning and prioritization of tasks.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
99/1020
c 50
60 more men
The local value of 7 in the number is at 10000 so 7×10000 and face of 7 is 7
So 70000 -7 so the answer is C 69993
half and hour