let (xy) be original number.
then, 10y + x +45 = 10x + y; eq 1
and x + y = 13; eq 2
solve ab equation,
then xy = 94;
A. Rs. 8000, Rs. 7500, Rs. 3500
Fathers before age=3*before sons age—-(1)
After 2.5 years..
Fathers before age+2.5 years =2.5*sons age—-(2)
Substitute (1) in (2),
3*sons before age+2.5 years=2.5*sons age
0.5*sons age=2.5 years
Sons before age=5years
So current age after 2.5 years,
Sons before age+2.5 =5+2.5=7.5 years
32
MBA refers to Master Of Business application, so that the line says as well our day to day life is also consider as an business, and second by science stream but why not in other, it depends on the capacity of student and smart move kind off.
12
163
A can give B (5 min – 4 1/2 min) = 30 sec start.
The distance covered by B in 5 min = 1000 m.
Distance covered in 30 sec = (1000 * 30)/300 = 100 m.
A can give B 100m start.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Answer :sister- in- law
explanation: y is the daughter of x’s brothers wife’s father-in-law = y is the daughter of x’s brother’s wife’s father = y is the wife of x’s brother = y is x’s sister-in-law
1/8
Because from there i can do more and learned more too
it was a friday.
9