VVDN Technologies is a leading product engineering and manufacturing company, renowned for its innovative solutions across various industries, including automotive, consumer electronics, networking, and telecommunications. With a focus on cutting-edge technology, quality, and customer satisfaction, VVDN offers end-to-end services, from product conceptualization and design to manufacturing and after-sales support.
At VVDN Technologies, we pride ourselves on our ability to deliver world-class solutions that meet the evolving needs of our clients. Our team of skilled engineers and developers work tirelessly to design and develop cutting-edge products and solutions that help our clients stay ahead of the competition and achieve their business objectives.
One of the key strengths of VVDN Technologies lies in our state-of-the-art manufacturing facilities and rigorous quality control processes. We adhere to the highest standards of quality and reliability, ensuring that every product that leaves our facilities meets the strictest quality standards.
How will you know the odd is in lighter one or heavier one from only one weighing. It will require 2 weighing to find the odd set and one weighing for odd coin in that set i.e total 3 weighings.
10 minutes
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
Before Swapping
_ _ _ _ _ _ _ Shilpa ……..Reena _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
After Swapping
_ _ _ _ _ _ _ Reena _ _ _ _ _ Shilpa _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
—————————–>14=17 <——————————-
So total number of girls in that row are 30
c
8 days
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
( C ) Crawl
if initially the price was Re 1.the new price nw bcoms to b
0.7..
so ,if the price z 0.7 ,the increment required is 0.3
so % in crement= 0.3/0.7*100=42.87…
Ans. 175
Relative speed in m/s=40-22=18X5/18=5m/s
Total distance=125+x m
T=1min=60 s
D=sXt
125+x=5X60
x=175
400
a) 90
b) 36
c) 56
d) 6
e) 140
f) 20
g) 30
H) 40 because u need to take in account the people that
done like any of the music maybe they like techno?
190, 166, 145, 128, 112, 100, 91
128 is incorrect. There is a difference of multiples of 3 in the number pattern, which starts at 24 and reduces by 3 each time. Therefore the correct pattern would read 190, 166, 145, 127, 112, 100, 91.
this would leave the pattern with differences in the pattern 24, 21, 18, 15, 12, 9. The next number in the pattern would be 6 lower than 91. 91 – 6 = 85. Then 85 -3 – 82, followed by 82 – 0 = 82. After this, if -3 were taken the pattern would start to rise so 82 – – 3 = 85.
(x**2 – 6* x + 5) = (x-1)*(x-5)
(x**2 + 2 * x + 1) = (x + 1) * (x+1) = (x+1)**2
For what x is (x-1)*(x-5)/( (x+1)**2) a minimum?
One way to answer this question is by using calculus.
Take the derivative, and set to zero.
Since this is a fraction of polynomials, and a fraction is
zero only if it’s numerator is zero, we need calculate only
the numerator of the derivative and set it to zero.
The numerator of the
Derivative of (x-1)*(x-5)/( (x+1)**2) is
( (x-1) + (x-5) ) ( x+1)**2 – (x-1)(x-5)( 2 (x+1) )
= (2 x – 6) (x+1)**2 – (2) (x-1)(x-5) (x+1)
= 0
Divide through by 2 (x+1)
(x-3)(x+1) – (x-1)(x-5) = 0
(x**2 – 2 x – 3 ) – (x**2 – 6 x + 5) = 0
x**2 – x**2 – 2 x + 6 x – 3 – 5 = 0
4 x – 8 = 0
x = 2
Plugging in x = 2 into the original
(x**2-6*x+5)/(x**2+2*x+1)
gives us (2**2 – 6 * 2 + 5)/(2**2 + 2*2 + 1)
= (4 – 12 + 5) / (4 + 4 + 1) = -3/9 = -1/3
Least value is -1/3
8925
6084
7431 is largest number and 1347 is the least number from digits 1,3,4,7
so 7431-1347=6084
Let the money borrowed by Nitin=Rs.P
According to the question,
(P×6×3)/100+(P×9×5)/100+(P×13×3)/100=Rs.8160
ans=8000