- Universal Weather and Aviation General Aptitude Interview Questions
- Universal Weather and Aviation Trainee Interview Questions
- Universal Weather and Aviation Personal Questions round Interview Questions
- Universal Weather and Aviation HR Interview Questions
- Universal Weather and Aviation Lead Interview Questions
189
150 m
as i assume the time taken to complete the job is not to be
changed while increasing the employees as it does not
clearly states so……….
30 men wrk for 9 hrs
therefore for the work to be done if no of workers is
increases the no of hrs / day to work should decrease so
here s a inverse relation
solving further we get
30 = K /9 ==> K= 270
now
40 = 270/y ==> y= 6.75
therefore ans is d)none
1875
the answer is 45 km/h
Define x:
Let the total distance be x.
Find the time needed in terms of x for speed at 30 km/h:
Find the time needed in term of x for 40 km./h:
Find the difference in time:
Solve x:
Find the total time needed to for the whole journey:
Given that he was 40 mins late:
Find the minimum speed needed:
Answer: The minimum speed is 45 km/h
How it is possible ? Please write in detail !!! This answer
s not a use !!!
1 1 2+4
2 2 1+4
3 1+2 4
4 4 1+2
5 4+1 2
6 4+2 1
7 4+2+1 0
I think it’s 32 not 37
5 trains
let the total work to be done =1
so a+b+c=1 (say)
then a and b are supposed to do 7/11 th of work
so c= 1- (7/11)
c=4/11
therefore c gets (4/11)*550
=200 is the answer
wake up guys and see modulo % can return only integer value.
So answer will be 1 and all other answers are wrong. You can
run your equation in C code and check the output.
Lawyer
Dear friends i ofcourse confused like you when i come
across to solve this problem. Really friends its very
simple if you understand the question clearly. First thing
is what is mean by “as many as” means its called ‘idiom and
phrase’ in english and it means “the same number of”. now
read the question “how many pairs of letters in STAINLESS
which has same number of letters between them in the word
as they have in english alphabet”.
In the alphabetical order, A-Z can be numbered as 1-26.
In A(INL)E which is same as in the alphabetical order A
(BCD)E. In both the cases E is in the Fourth position. so
we got one pair.
And in ST, there are no letters between them in the word
stainless. In alphabetical orer from A-Z also there is no
letters between them..so we got the second pair…
In STAINLESS it has two pairs ST and AE
Joe is fencing in a square area of 576 square feet.
Fence posts, which are needed every three feet, cost 32.00 each.
The fencing cost 4.50 per foot. What is the total cost of the fencing materials?
Solution:-
Area of Square is 576 sq ft.
so, the length of side = root(576) = 24 ft
Since the fencing would be done on the perimeter, we would need that
formula is 4*side = 96 ft.
Number of Fence post needed = 96/3 = 32
1 Fence post cost = 32
32 Fence Post cost = 32 * 32 = 1024
Fencing cost = Perimeter * fencing cost = 96 * 4.5 = 432
Total Cost = 432 + 1024 = 1456