17:3
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
A
FLRIHO=cooler
2hr 24min
a. (x+y)'=x'.y' b. (x'+y')'=x.y
c. (x'.y')'=x+y d. (x'+y')'=x'.y'
C
c=a/b
c=a-1
=>b=a/c
=>b=a/a-1
B says " the horse is either brown or grey."
c says " the hoese is brown"
At least one is telling truth and atleast one is lying.
tell the colour of horse.
brownish grey
As fast as possible. For example, I will suitable with the working environment within one month.
4500 sal of jan
What was his salary to begin with?
Assume his salary was Rs. X
He earns 5% raise. So his salary is (105*X)/100
A year later he receives 2.5% cut.
So his salary is ((105*X)/100)*(97.5/100)
which is Rs. 22702.68
So Ans is Rs.22176
6″
30 Sec