mausi
zero – as one letter cant be wrong – atleast two are to be wrong
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
let d distance and s be speed.
d/7 = x and d/5 = x+12
solving we get d=210.
Maximum number of edges = 9. Start from one corner. Select any face including that corner. Complete a square (4 edges) around the face to reach at the starting corner point . Now, move to the opposite face through the edge joining them and passing through the starting point(1 edge). Now, complete the square of edges around this face(4 edges). Total = 4+1+4 = 9 edges
If a blue stone is thrown into a red sea, several things could happen depending on the context and the properties of the stone and the sea:
Symbolically: Since blue and red are contrasting colors, the interaction of a blue stone in a red sea could be seen as a visual or metaphorical contrast. It could represent a stark difference or an unexpected element introduced into an existing situation.
Scientifically: In reality, the color of the stone and the sea would not have a direct physical impact on each other. The stone would sink or float based on its density and the water’s buoyancy. The color of the water, whether red or any other color, does not change the fundamental principles of objects interacting with liquids.
It’s important to note that red seas, in the context of bodies of water, typically do not exist naturally. The phrase “red sea” is often used metaphorically or symbolically rather than referring to an actual body of water with a red color.
13km
100
740
(130+x)/30=(45×5/18)
245 meters
7:3
7 Hr 30 Min
42m
4%
39 hrs 15 mins..
note:
he will not be having .45 mins for his lunch on saturday..