The correct ANS: option C
The Answer is 3
Assume Q can do the work alone in Q days:
work of a day by both P and Q =>
(1/15) + (1/Q ) = 1/6
solving this Q = 10.
Here is the solution to the given version of the puzzle (9 balls, one is heavier, need to identify oddball), where we label the balls A, B, …, I:
1. Weigh ABC versus DEF.
Scenario a: If these (1) balance, then we know the oddball is one of G, H, I.
2. Weigh G versus H.
Scenario a.i: If these (2) balance, the oddball is I.
Scenario a.ii: If these (2) do not balance, the heavier one is the oddball.
Scenario b: If these (1) do not balance, then the oddball is on the heavier side. For simplicity, assume the ABC side is heavier, so the oddball is one of A, B, C.
2. Weigh A versus B.
Scenario b.i: If these (2) balance, the oddball is C.
Scenario b.ii: If these (2) do not balance, the heavier one is the oddball.
answer is maximum of 2.
democrate=1008
1
In this question only one data is given ie., hole length - 6". In the question there is no mistake.
Find the answer.
volume of a sphere is 4/3 * pi * r^3
by drilling a hole 6 inches long the volume of the sphere is
not affected bcos the hole is a 1 dimension quantity..(say a
straight line) n so it does not have any value w.r.t volume…
hence the volume of the sphere does not change..
Please let me know answer.
Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.
dividend=divisor*quotient+remainder
x=1000*(2*(110))+30
x=22000+30
x=22030
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
10%=394;50%=1970;250%=9850;30%=1182;
250%+30%=9850+1182=11032
( b ) 40 sq cm
x+8y=20, x=-3y
(-3y)+8y=20
5y=20
y=4
The answer for y is 4
coz steam has more heat content than hot water
24
740