- Saolta university health care group General Aptitude Interview Questions
- Saolta university health care group Trainee Interview Questions
- Saolta university health care group Personal Questions round Interview Questions
- Saolta university health care group HR Interview Questions
- Saolta university health care group Lead Interview Questions
Distance =speed ×time
Speed =90kmph
90km take 60min time to reach
In 10min the distance covered =?
D=90×10/60
900/60
D=15
3, 4, 9, 22.5, 67.5, 202.5, 810
A. 4
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
270/(27*1000)*3600=36
The rational number that does not have a reciprocal 0 because reciprocal of 0 is undefined.
16
Let the distance between each pole be x m. Then, distance up to 12th pole = 11x m
∴ Speed = 11x22m/s
∴ Time to cover total distance up to 20th pole
= 19x×2411x
= 41.45 s
name
Ans : – 215
Explanation :-
1^3 = 1-1=0
2^3 = 8-1 = 7
3^3 = 27-1=26
4^3 = 64 – 1 = 63
5^3 = 125-1 = 124
Hence, Ans is
6^3 = 216-1=215
My definition of success is being able to complete the task given to me in the provided timeline
take goat from one side and leave it another side and then come back another side and carry cabbage from one side leave it near goat and carry goat back to other side and then carry wolf leave it another side with cabbage come back to
goat side and carray goat to other side not all three are there on another side
Ans =18
Explanation:
Assume that initial there were 3*X bullets.
So they got X bullets each after division.
All of them shot 4 bullets. So now they have (X – 4)
bullets each.
But it is given that,after they shot 4 bullets each, total
number of bullets remaining is equal to the bullets each
had after division i.e. X
Therefore, the equation is
3 * (X – 4) = X
3 * X – 12 = X
2 * X = 12
X = 6
Therefore the total bullets before division is = 3 * X = 18
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
(x+2)^2 -x^2 = 84
X=20
So (20,22)
Sum= 42
I agree with @TUMWINE PETER
55