Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Ques:- The citizens of planet nigiet are 8 fingered and have thus developed their decimal system in base 8. A certain street in nigiet contains 1000 (in base 8) buildings numbered 1 to 1000. How many 3s are used in numbering these buildings?
Recent Answer : Added by Mahak On 2022-08-14 16:29:26:
answer is one
Ques:- Tell of a time you made a mistake and how you dealt with it?
Ques:- 9 men and 12 boys finish a job in 12 days, 12 men and 12 boys finish it in 10 days. 10 men and 10 boys shall finish it in how many days?
Recent Answer : Added by MyDotcollection On 2022-03-09 16:42:06:
8days
Ques:- The food in a camp lasts for 30 men for 40 days. If ten more men join, how many days will the food last?
Ques:- How do you feel about responsibility?
Ques:- Feasibility about travelling, Future studies plan, etc
Ques:- A drinks machine offers three selections – Tea, Coffee or Random (Either tea or Coffee) but the machine has been wired up wrongly so that each button does not give what it claims. If each drink costs 50p, how much minimum money do you have to put into the machine to work out which button gives which selection ?
Recent Answer : Added by Franck On 2022-08-14 16:42:24:
Correct Deven,
Ques:- Wat will happen to d level of water when u drop a suitcase from a boat
Ques:- P and Q start a business with Rs.6000 and Rs.8000 respectively. Hoe should they share their profits at the end of one year?
Recent Answer : Added by REGULLA RAJU On 2022-12-20 12:54:08:
Explanation:
They should share the profits in the ratio of their investments.
The ratio of the investments made by A and B =
6000 : 8000 => 3:4
Ques:- Three 6 faced dice are thrown together. The probability that all the three show the same number on them is -.
Ques:- 12.05 x 5.4 ? 0.3 = ?
Recent Answer : Added by Admin On 2020-05-17 12:03:30:
( b ) 216.90
Ques:- Are problems in life temporary?
Ques:- How many possible combinations are there in a 3x3x3 rubics cube? In other words, if you wanted to solve the rubics cube by trying different combinations, how many might it take you (worst case senerio)? How many for a 4x4x4 cube?
Ques:- If a card is drawn from a well shuffled pack of cards, the probability of drawing a spade or a king is -.
Recent Answer : Added by Jim On 2022-09-15 16:37:22:
Spade 13/52 = 1/4
King 4/52 = 1/13
Spade OR King 13/52 + 4/52 – 1/52 (because the King of Spades is in both groups) = 16/52 = 4/13
Ques:- Two pipes X and Y can separately fill a cistern in 18 and 24 hours respectively. If they are turned on alternately for one hour each, how long will it take to fill the cistern?
Recent Answer : Added by Admin On 2022-09-28 17:08:06:
X filling rate is 1/18 or 4/72 per hour
Y filling rate is 1/24 or 3/72 per hour
Combined as a pair it’s 7/72 in a complete 2 hour alternating sequence
72+ 7/72 =10 sequences = 70/72 on 20 hours, The outstanding balance is just 2/72
So at 20.5 hours with X turn filling is 100% complete with 72/72
Answer: It will take 20.5 hours to completely fill this tank.
Analysis of measured filling process, from X = 42/72 share & from Y = 30/72 share
Ques:- How would you spend a million pounds ?
Ques:- About Family background, Checked the communication skill, way of dispensing the medicine.
Ques:- IF U GET A REBIRTH WHAT WOULD U LIKE TO BE
Ques:- How much salary do you want to received?
Ques:- Greengrocer C. Carrot wants to expose his oranges neatly for sale. Doing this he discovers that one orange is left over when he places them in groups of three. The same happens if he tries to place them in groups of 5, 7, or 9 oranges. Only when he makes groups of 11 oranges, it fits exactly. How many oranges does the greengrocer have at least?
Ques:- If rupee one produces rupees nine over a period of 40 years, find the rate of simple interest?
Ques:- Will you sign a bond of 2 years with us?
Ques:- You have a bucket of jelly beans. Some are red, some are blue, and some green. With your eyes closed, pick out 2 of a like color. How many do you have to grab to be sure you have 2 of the same?
Recent Answer : Added by Juan On 2022-08-14 16:25:19:
at least 2, at most 4….
2 if you get lucky the first 2 times you draw a jelly bean, 4 would be if in the first 3 tries you get one of each color and the next draw will get you 2 of the same color
Ques:- What is your big achivment?
Ques:- The incomes of two persons A and B are in the ratio 3:4. If each saves Rs.100 per month, the ratio of their expenditures is 1:2 . Find their incomes?
Recent Answer : Added by srikanth On 2022-03-09 16:41:20:
50 each
3x -y = 100
4x-2y = 100
Ques:- From which collage you have completed your MBA?
Ques:- P, Q, R and S are playing a game of carrom. P, R and S, Q are partners. S is to the right of R who is facing west, then Q is facing?
Recent Answer : Added by Karishma Sukhwani On 2022-08-14 16:39:53:
North
Ques:- 3 runs required is 3 balls to win the match only on wicket left,the batsman is on 97 and runner on 98. how will both batsman score centuries as well as win the match?
Recent Answer : Added by Admin On 2022-09-27 18:46:51:
The batsman on 98 is on strike. He hits the ball and they run 3. UNFORTUNATELY one of the batsmen doesn`t turn correctly for one of the runs and the umpire calls ONE SHORT and awards only two runs. Therefore the first batsman has his century. There is now 1 ball remaining and one run is required to win. The batsman on strike, however is now the one on 97 runs. He now either hits a 4 or a 6. They win the game and both batsmen scored centuries.
Read more: 3 runs required in 3 balls to win with only a wicket left. The batsmen is on 98 and the runner is on 97. How will both the batsmen score centuries … – 3 runs required in 3 balls to win with only a wicket left. The batsmen is on 98 and the runner is on 97. How will both the batsmen score centuries as well win the match ?
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.