2* pi* r ( h + r )
r=3cm
h=7cm
2 * 22/7 *7 ( 10 ) = 440 sq cm
No sentence can end with because because, because is a conjunction
11
DISSENTIAL
share= 5:7
i.e.,
=9600*5/12
= 4000
x and y can be equal to 1..
If so,then he gets 1/1 of Rs.10 which is equal to 10 and
again 1/1 of Rs.10=Rs.10..so,he gets total of 20..and
returns 20..so,no gain and no loss..
If x=1,y=2,he gets, 5+20=25..and returns 20..so he may not
lose..
So,whatever be the values of x and y,only these two answers
are possible..
so its a)He never loses..
Six men can at a time put mangala sutra (marriage) to their
spouses where six women cant do
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
b
upstream = 25km/hr
downstream=35km/hr
so…if the speed of current would be 5km/hr and boat speed = 30km/hr
so that it will be change towards upstream and downstram…
let original radius=100
original surface area lets say it x =4 * (22/7) * 100 *100
new radius=100 + 50% of 100=150
new surface area lets say it y = 4 * (22/7)* 150* 150
increase in surface area=((y-x)/x) * 100
i.e.
((4*(22/7)*150*150 – 4*(22/7)*100 *100) / (4*(22/7)*100*100))*100
=125
so the answer is 125%.
hope this helps you.
5
Ramu’s Mother-in-law means Ramu’s wife’s mother
Only daughter means Ramu’s wife
And daughter’s son means Ramu’s Son
Answer : Son
30mins
Let the total time taken to fill the tank be x minutes.
Then, work done by B in half hour + work done by (A+B) in half hour =1.
(
40
1
×
2
x
)+(
60
1
+
40
1
)×
2
x
=1
⇒
80
x
+
48
x
=1
⇒
240
3x+5x
=1
⇒8x=240
⇒x=30 min
In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132