3:4
3x:4x
3x+4x=420
7x=420
x=60
smaller number=3(60)=180.
Y
24 times
( d ) 8404
190 sec
Speed of train = 54km/hr
= 54 x (5/18) m/s
= 15 m/s
Length of train = 165m
Time required to cross a bridge of 660m in length = (660+165) / 15
= 55 seconds
no combinations is there because a number divisible by 36
also divisible by its divisors anu.sum of 4 digits=20,whis
is not multiple of 3.so it is cannot divisible by 3
20 minutes
31yrs
4/52 * 3/51
Suppose the lengthier arm of weighing pan is of x cm and other arm is y cm .Also let weight if each melon be m kg.
so applying equilibrium of torque principles ,we get
case 1:-
1x-8my=0
case 2:-
2mx-1y=0
using case 1 equation , we substitute value of x into case 2 equation;
16mmy-1y=0
(16mm-1)y=0
y is length of weighing arm and cannot be 0,
therefore ,
16mm-1 =0
16mm=1
mm=1/16
m= square root (1/16)
m=+-1/4
m is weight of melon and cant be negative.
Hence m, weight of one melon is 1/4 kg
156
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
cut a sphere in all 3 axis with center point as common point
of all axis.
u would be getting 2 lines and an arc
in other words
sphere is cut into 3 cuts in x,y,z directions
it is only similar