In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132
FOR 15 = RS.20
FOR 20 = RS.18
FOR 25 = RS.16
FOR 30 = RS.14
FOR 35 = RS.12
FOR 40 = RS.10
five multiplication & three addtion
8men=6days
Xmen=1/2days
M1=8,D1=6
M2=X,D2=1/2
Formula:
M1*D1=M2*D2
8*6=X*(1/2)
X=8*6*2
X=96
Answer=96
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
maternal grand mother
(b) 330 is the amswer
as the no of toys are equall to no of students
18*18= 324
left out toys afetr distribution = 6
so 324+6= 330
(1/2 + 1/2) = 1
2(1 + 1/2) = 3
2(3 + 1/2) = 7
2(7 + 1/2) = 15
2(15 + 1/2) = 31
350m
5/9