Mobiveil is a leading provider of silicon intellectual property (IP), platforms, and IP-enabled design services. The company specializes in providing customizable IP solutions for networking, storage, and IoT applications, catering to the needs of semiconductor companies, system OEMs, and electronic design automation (EDA) vendors.
Mobiveil offers a range of IP cores, including high-speed serial interconnect solutions like PCIe (PCI Express), NVMe (Non-Volatile Memory Express), and Ethernet, as well as memory controller IP for DDR (Double Data Rate) and LPDDR (Low-Power Double Data Rate) memory interfaces. These IP cores are essential building blocks for designing complex system-on-chip (SoC) solutions, enabling high-performance connectivity and efficient data processing.
In addition to its IP portfolio, Mobiveil also provides platform solutions such as FPGA-based development platforms and reference designs, which help accelerate the development and validation of SoC designs. These platforms are equipped with pre-verified IP cores and software drivers, allowing designers to quickly prototype their designs and reduce time-to-market.
Furthermore, Mobiveil offers design services to assist customers in integrating its IP cores into their SoC designs. The company's team of experienced engineers provides consulting, customization, and integration services, ensuring seamless integration and optimal performance of the IP cores in the final SoC product.
Overall, Mobiveil plays a crucial role in the semiconductor ecosystem by providing essential IP solutions and design services that enable the development of cutting-edge SoCs for a wide range of applications, including networking, storage, automotive, and industrial IoT.
I think it’s 32 not 37
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
7
I need a answers from hakuna matata questions
45 km/hr
16, 33, 65, 131, 261, (…..)
523
Distance covered by B to meet A=Total distance – Distance covered by A hrs
[using : distance = speed x time]
Putting value of from equation (1),
hrs
Therefore, time at which both A and B will meet is = 7 a.m. + 3 hrs =10 am
Hi frnds I think U got wrong,
It was said that 4 ends not 4 corners
Here Ends are sides
So there is no way of extending a side
So the answer is incresing the depth
one cat kill one rat six minutes
so 1 cat kill 100 rat willbe needed 6*100=600minutes
then 100 rates kill 50minutes means then 600/50=12
so the answer is 12
(x+2)+(x)+(x-2)
X+2+x+x-2=18
3x=18
X=6
The 3digit number is 864
1*2=2
2*2=4
2*4=8
8*4=32
Ans : 32
twenty members