Mencap Interview Questions Answers, HR Interview Questions, Mencap Aptitude Test Questions, Mencap Campus Placements Exam Questions

Find best Interview questions and answer for Mencap Job. Some people added Mencap interview Questions in our Website. Check now and Prepare for your job interview. Interview questions are useful to attend job interviews and get shortlisted for job position. Find best Mencap Interview Questions and Answers for Freshers and experienced. These questions can surely help in preparing for Mencap interview or job.

This page contains the most recently asked technical questions and answers in the Mencap.

All of the questions listed below were collected by students recently placed at Mencap.

Ques:- a survey of 250 ppl found that 223 have tatoos,178 wore leather,158 own harry davidson,151 wore tatoo and leather,119 wore leather and own harley,142 have tatoo and a harley, 103 have all the 3 items.draw a venn diagram n explain how many
A. had only harley davidson?
B. had atleast 2 of the 3 items?
C. had none of the items?
D. had tatoos or were wearing leather?
E. were not wearing leather but did have tatoos and did own a harley?
Recent Answer : Added by Admin On 2020-05-17 12:05:24:

a)0
b)206
c)0
d)250
e)39
f)92

Ques:- The length of the base of a triangle is three times the height. The area of the triangle is 24 square inches. Find the length of the base of the triangle. (Area=1/2bh)
Recent Answer : Added by Admin On 2020-05-17 12:05:17:

length of the base=3 times height
b=3h;
h=b/3;
so, 1/2bh=24
1/2b(b/3)=24
(b^2)/6=24
b^2=144
b=12

Ques:- Convert 251 decimal to base 8(i.e. octal)?
Recent Answer : Added by Admin On 2020-05-17 12:01:28:

373

Ques:- On a given day, a bank had 16000 cheques returned by customers. Inspection of the first 800 cheques indicated that 100 of those 800 had errors and were therefore the available immediately for data processing. On this basis, hwo many cheques would be available immediately for data processing on that day?
Recent Answer : Added by Admin On 2020-05-17 12:00:25:

Out of 800 cheques 100 are for data processing.
Out of 16000 cheques = (100/800)*16,000 = 2000 cheques

Ques:- A certain street has 1000 buildings. A sign-maker is contracted to number the houses from 1 to 1000. How many zeroes will he need?
Recent Answer : Added by shubham On 2021-10-07 15:41:19:

192 zeros in 1 to 1000

Ques:- There is a log A having weight 30kgs. The thickness of the log is twice as another log B. And log A is half short as B. What is the weight of B?

Your donation keeps our website running smoothly and accessible to all. Support us today to ensure we continue to provide valuable information and resources.

Ques:- There is a 4 inch cube painted on all sides. This is cut down into of 1 inch cubes. What is the no of cubes which have no pointed sides?
Ques:- How many regions (open or closed) can n straight lines give at the maximum?
Ques:- Do the SWOT analysis of yourself?
Ques:- All men are vertebrates. Some mammals are vertebrates. Which of the following conclusions drawn from the above statement is correct. 1. All men are mammals 2. All mammals are men 3. Some vertebrates are mammals. 4. None
Recent Answer : Added by Sujanya On 2022-03-18 09:18:24:

3

Ques:- Describe a time when you took extra effort to make sure the person with whom you were communicating with had really understood your point. How did you do this?
Ques:- You are not from accounts background, how would you manage?
Ques:- What about your self? aim strenth etc?
Ques:- The difference between simple and compound interests compounded annually on a certain sum of money for 2 years at 4% per annum is Re. 1. The sum (in Rs.) is?
Ques:- How am I an Ideal candidate for this post
Ques:- A large tanker can be filled by two pipes A and B in 60 minutes and 40 minutes respectively. How many minutes will it take to fill the tanker from empty sate if B is used for half the time and A and B fill it together for the other half?
Ques:- X, Y and Z can do a piece of work in 24, 30 and 40 days respectively. They start the work together but Z leaves 4 days before the completion of the work. In how many days is the work done?
Recent Answer : Added by Admin On 2022-09-29 17:23:19:

One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.

C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.

Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.

Remaining Work = 7/10, which was done by A,B and C in the initial number of days.

Number of days required for this initial work = 7 days.

Thus, the total numbers of days required = 4 + 7 = 11 days.

Ques:- X, Y and Z can do a work in 6, 8 and 12 days respectively doing the work together and get a payment of Rs.1800. What is Y’s share?
Ques:- A is 40 m south-west of B. C is 40 m south-east of B. Then C is in which direction of A?
Recent Answer : Added by Singram On 2021-12-04 15:01:51:

East

Ques:- What is the difference between hard work and smart work?
Scroll to top