Marquistech, a cutting-edge technology company established in 2010, has rapidly ascended to prominence in the digital landscape. Specializing in software development, data analytics, and cybersecurity solutions, Marquistech has garnered a reputation for innovation and reliability. Headquartered in Silicon Valley, with additional offices in major tech hubs globally, the company boasts a diverse team of top-tier engineers, developers, and analysts dedicated to pushing the boundaries of technological advancement.
Marquistech's flagship products include advanced data management platforms, AI-driven cybersecurity systems, and bespoke software solutions tailored to clients' specific needs. Their expertise spans various industries, from finance and healthcare to manufacturing and retail, providing tailored digital solutions that optimize efficiency and security while driving growth and profitability for their clients.
What sets Marquistech apart is their unwavering commitment to staying ahead of the curve. They invest heavily in research and development, ensuring their technologies remain at the forefront of innovation. Moreover, their customer-centric approach prioritizes understanding clients' challenges and delivering solutions that exceed expectations.
With a track record of successful projects and a dedication to pushing technological boundaries, Marquistech continues to be a leading force in shaping the digital landscape of tomorrow.
Relative speed =65-45km/hr
Relative speed=20km/hr
Convert to m/s
S=20*5/18
S=5.555
Length of the faster train =5.55555*18seconds
=100meters
Train speed 90 km /h
1st we have to change in m/s. then 90*5/18=25m/s
Then d=speed*time
=25*10=250m train length
⇒ First part = Rs. 828
– While the train is moving, the jogger will also be running in the same direction.
– for the head(engine) of the train to get to the current position of the jogger 240m away, it will take:
45km/hr => 12.5m/s => 240/12.5 = 19.2 seconds.
– But in the same period of time, the jogger will still be running and will have moved to a new location by: 9km/hr => 2.5m/s => 2.5 * 19.2 = 48m
To get to the new location at the speed of 12.5m/s will take the train:
48/12.5 = 3.84sec
In this additional time, the jogger will move forward by:
3.84 * 2.5 = 9.6m
at a speed of 12.5m/s, it will take the train less than a second to cover the additional 9.6m
If we add the distance the jogger will cover in 1 second to 9.6, it is still less than what the train can cover per second. let us see (9.6 + 2.5 = 12.1)
Therefore, the head of the train will pass the runner at approximately: 19.2 + 3.84 + 1 => 24.04 seconds.
For the train to completely pass the runner, it will need its whole length of 120m to be in front of the runner.
This will take an additional (9.6 + 2) seconds.
Therefore for the length of the train to be ahead of the runner it will take approx. 35.65 (24.04 + 9.6 + 2) seconds
Let the total number of matches to played in the tournament be ‘x’.
Given that A county cricket team has won 10 matches and lost 4.
That means total number of matches played = 14.
So,
= > 70% of x = 14
= > (70/100) * x = 14
= > 70x = 1400
= > x = 20.
So, the number of matches to be played = 20.
They have a record of exactly 75% wins = 20 * 75/100
= > 15.
Therefore, the number of matches should the team win = 15 – 10 = 5.
Hope this helps!
After the mixing, 1lt of the mixture has 0.8lt of milk and 0.2lt of water. 1lt of milk costs Rs.12 so 0.8lt of milk costs 0.8 x 12 = 9.6
He sells the mixture at Rs.15,
so profit%=(15-9.6)/9.6 x 100 = 56.25%
3, 8, 15, 24, 34, 48, 63
8-3 = 5
15-8 = 7
24-15 = 9
34-24 = 10 this one should be 35-24 = 11
48 – 34 = 14 based on the correction will be 48-35 = 13
63-48 = 15
the difference will create a series 5,7,9,11,13,15…..etc
“RAW”:
RAW IS AN INDIAN INTILLIGENCE WING.
“RESEARCH AND ANALYSIS WING”
Father’s sister
Options:
A) EDRIRL
B) DCQHQK
C) ESJFME
D) DEQJQM
Ans: A)
2 Leap years
+2 to tuedsay
Thursday is the correct answer