To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
R
T,P,R,Q,S
1^1,2^2,3^3,4:^4,5^5,6^6
1,4,27,256,3125,46656
d / (x+1/2) = 4/5 * t
and d / (x-1/2) = 5/2 + t
solving we get d = 15.
17:3
MEDICINE will become EOJDJEFM in the same code.
Bopri is farthest to the west followed by Kakran, Akram, Tokhada, and Paranda to the east.
13. 253, 136, 352, 460, 324, 631, 244
324
the sum of all = 10
Accept
324 = 3+2+4 =/=10 (NOT EQUAL TO 10)
Let:
1. speed of boat in still water = x
2. speed of stream = y;
Then net speed of boat upstream = x – y = 16km / 4 h = 4kmph
Net speed of boat downstream = x + y = 16 / 2 = 8kmph
Now solve for x to get x = 6kmph in still water.
877.4