- Gtr (govia thameslink railway) General Aptitude Interview Questions
- Gtr (govia thameslink railway) Trainee Interview Questions
- Gtr (govia thameslink railway) Personal Questions round Interview Questions
- Gtr (govia thameslink railway) HR Interview Questions
- Gtr (govia thameslink railway) Lead Interview Questions
1896172
Let’s assume the length of each train is ‘L’ and the speeds of the two trains are ‘V₁’ and ‘V₂’ respectively.
When the trains are moving in the opposite direction, their relative speed is the sum of their individual speeds. The total distance they need to cover is the sum of their lengths. Since they cross each other completely in 5 seconds, we can set up the following equation:
(V₁ + V₂) × 5 = 2L
When the trains are moving in the same direction, their relative speed is the difference between their individual speeds. The total distance they need to cover is the difference between their lengths. Since they cross each other completely in 15 seconds, we can set up the following equation:
(V₁ – V₂) × 15 = 2L
Now, let’s solve these equations to find the ratio of their speeds.
From the first equation, we have:
(V₁ + V₂) × 5 = 2L
V₁ + V₂ = (2L) / 5
From the second equation, we have:
(V₁ – V₂) × 15 = 2L
V₁ – V₂ = (2L) / 15
Let’s add these two equations together:
V₁ + V₂ + V₁ – V₂ = (2L) / 5 + (2L) / 15
2V₁ = (6L + 2L) / 15
2V₁ = (8L) / 15
V₁ = (4L) / 15
So, the speed of the first train is (4L) / 15.
Now, let’s substitute this value back into the first equation to find V₂:
(4L) / 15 + V₂ = (2L) / 5
V₂ = (2L) / 5 – (4L) / 15
V₂ = (6L – 4L) / 15
V₂ = (2L) / 15
Therefore, the speed of the second train is (2L) / 15.
The ratio of their speeds is given by:
(V₁ / V₂) = ((4L) / 15) / ((2L) / 15)
(V₁ / V₂) = 4L / 2L
(V₁ / V₂) = 2
So, the ratio of their speeds is 2:1.
740
No of men employed = N
No of days to finish the work = 9 days
No of men after increase = (N + 10)
No of days to finish the work = 6 days
Equating mandays
9N = (N+10)*6
9N — 6N = 60
3N = 60
N = 20
No of men employed = 20
Assuming the youngest has X years, so we have
X+(X+3)+(X+6)+(X+9)+(X+12)=50
5X+30=50
5X=20
X=4
The youngest has 4 years
x/2y=3/2…
therefore
2x=6y
x=3y
therefor
=21y+4y/3y-2y
=25y/y
=25..
there answer=25
so for the above question, we don’t have an option…so answer
is Data Insufficient..
answer is 100
[(45 men*8hours)/30 meters]=12 (working rate)
[(x men*5 hours)/50 meters]=12 (working rate is same)
then x=100
20
Creative mind and innovative ideas is what I can offer to you. Please have a look at my work portfolio. I do not copy anyone’s work, I do not try to imitate the work of other creators. Gaining my inspiration from everyday life
let the 4 digit number be ABCD.
First Digit is A :
Therefore; according to the question
A=B/3
B=3A
C=A+B=A+3A=4A
D=3B=3(3A)=9A
Since the last Digit is D and it can neither be double-digit nor 0 ;
Therefore ;
A=1;
B=3A=3(1)=3
C=A+B=1+3=4
D=9A=9(1)=9
Therefore, the 4 digit number is 1349.
I believe it will be 30 km/hr