45
5
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s
1.7% loss
30.5
64
B
Tree
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
say the work is w and let no of days taken by b is ‘x’ which
we have to calculate
so work done by a in one day is w/6
work done by b in one day is w/x
a and b together can do work in 4 days ie=(w/6)+(w/x)=(w/4)
solving equation x=12
so no of days taken by b=12
assume the ratio 6:4 to be 60:40
boys taking lunch in canteen=60% of 60=36
Girls taking lunch in the canteen=40% of 40=16
Total boys and girls taking lunch in the canteen=52
Total students we assumed is 60+40=100
Therefore percentage of boys and girls taking lunch in the canteen=(52/100)*100=52%
1
445, 221, 109, 46, 25, 11, 4
C.46
4+7
11+(7*2)
25+(7*2*2)
53+(7*2*2*2)
109+(7*2*2*2*2)…..
20&130
Answer:50.24
Explanation:
Area of a circle =π*r*r
616=π*r*r
r*r= 616÷3.14
r*r =196
r =13
Circumference of a circle= 2*π*r
=2*π*13
=16*3.14=50.24