6″
Answer:
11 days.
Step-by-step explanation:
In the question,
Time taken by Ramesh to finish a piece of work = 20 days
Time taken by Sushil to finish a work = 25 days
Time for which they worked together = 5 days
Sushil left after = 5 days
So,
One day work of Ramesh is,
One day work of Sushil is,
So,
Work done in 5 days is given by,
Therefore, Remaining work is given by,
Now, as the Sushil left the remaining work was done by Ramesh,
Time taken by Ramesh for the remaining work is,
Therefore, the remaining work will be completed in 11 days by Ramesh.
x- sum of first 4 values
y – 5th value
x/4 = 45
x=45*4=180
(x+y)/5 = 46
(180+y)/5=46
180+y=230
y=50
previous ans wrong again..!!!!
first find x its 2 hours
total journey 6 hrs 3km up and also down
jill takes one hr to come down and jack takes 3 hrs so x
is 2 hours….
And while going up jack goes at 1.5km/hr and jill goes at
0.75 km hr so to travel 3 km they take 2 hrs and 4 hrs
respectively…!!! x again is 2 hrs…
so jack totally takes 5 hrs to travel 6 km
therfore speed is 6/5 km per hour
thats is 1.2 km per hour is the correct answer
LET ACTUAL PRICE BE 100 RS(FOR CONVINIENCE)
THEREFORE IF PRICE IS CUT BY 20%
THEREFORE NEW PRICE=100-20=80 RS
THEREFORE WE NEED TO ADD X% TO 80 RS TO MAKE IT 20 RS AND ADD IT TO 80 TO MAKE IT 100RS
THEREFORE, 80X/100 = 20
I.E. 4X/5=20
THEREFORE x=20*5/4
=5*5
=25
HENCE 25% OF PRICE SHOULD BE ADDED TO MAKE THE PRICE EQUAL TO THE ACTUAL PRICE.
24
562.
Balls- B1, B2, B3, B4, B5, B6, B7, B8, B9.
Group1 – (B1, B2, B3), Group2 – (B4, B5, B6), Group3 – (B7, B8, B9)
Now weigh any two groups. Group1 on left side of the scale and Group2 on the right side.
When weighing scale tilts left – Group1 has a heavy ball or right – Group2 has a heavy ball or balanced – Group3 has a heavy ball.
Lets assume Group 1 has a heavy ball.
Now weigh any two balls from Group1. B1 on left side of the scale and B2 on right side.
When weighing scale tilts left – B1 is the heavy or tilts right – B2 is the heavy or balanced – B3 is the heavy.
If discount is 25%
Profit 25%
If discount10%
Profit?
Suppose 100rs is price
25% discount make it 75
25%profit that means 75×100/125=60
Cp is 60
10 % discount make sp 90 profit is 30%
“Since I’ve been working and gaining experience to get into this company, I’d like to stay a long time if I’m offered the job, since this is where I want to be. “ “As long as there’s a lot of work to do, then I’d be happy to stay for a long time. Since I’m a busybody, I like to being productive most of the time.”
The last person covered 120.71 meters.
It is given that the platoon and the last person moved with
uniform speed. Also, they both moved for the identical
amount of time. Hence, the ratio of the distance they
covered – while person moving forward and backword – are
equal.
Let’s assume that when the last person reached the first
person, the platoon moved X meters forward.
Thus, while moving forward the last person moved (50+X)
meters whereas the platoon moved X meters.
Similarly, while moving back the last person moved [50-(50-
X)] X meters whereas the platoon moved (50-X) meters.
Now, as the ratios are equal,
(50+X)/X = X/(50-X)
(50+X)*(50-X) = X*X
Solving, X=35.355 meters
Thus, total distance covered by the last person
= (50+X) + X
= 2*X + 50
= 2*(35.355) + 50
= 120.71 meters
Note that at first glance, one might think that the total
distance covered by the last person is 100 meters, as he
ran the total lenght of the platoon (50 meters) twice.
TRUE, but that’s the relative distance covered by the last
person i.e. assuming that the platoon is stationary.