no
Answer: 3121 gold coins
Let total no of coins be M
Let the disbursement D to each son:
D1 = 1 + (M – 1)/5 = (M + 4)/5
D2 = 1 + ( M – D1 -1)/5 = (D1) * 4/5
D3= (D2) * 4/5
D4= (D3) * 4/5
D5= (D4) * 4/5
Total disbursements to sons=
= ∑D= (M+4)*1/5[ 1+4/5+(4/5)(4/5)+ (4/5)(4/5)(4/5)+(4/5)(4/5)(4/5)(4/5) ]
= (2101/3125)*(M+4)
Thus balance left for daughters =M-{(2101/3125)*(M+4)}
=(1024M-8404)/3125
This balance should be a positive integer ( assuming M and all disbursements are full coins )
Thus 1024M-8404 should be a multiple of 3125….so….
1024M – 8404 = N*3125 where N is an integer
Using Python code:
n=int(input(“Enter num n: “))
X=int()
a=int()
a=0
X=’ ‘
for a in range(0,n+1):
a=a+1
X= (3125*a + 8404)/1024
if (3125*a + 8404)% 1024== 0:
print(X,a)
Enter num n: 10000
3121.0 1020
6246.0 2044
9371.0 3068
12496.0 4092
15621.0 5116
18746.0 6140
21871.0 7164
24996.0 8188
28121.0 9212
We get minimum value of N = 1021 and M = 3121 gold coins
ANSWER is ==> 1
1st step : 0.5
2nd step : 0.5+0.05 = 0.55
3rd step : 0.55+0.10 = 0.65
4th step : 0.65+0.15 = 0.8
5th step : 0.80+0.20 = 1.00
For optimal size of a project team..
the % increase in staff size should be “Zero”
reason:
additional member directly proportional to increase in
staff size..
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
1.75-1.68=0.07
A wet stone
211
445, 221, 109, 46, 25, 11, 4
C.46
4+7
11+(7*2)
25+(7*2*2)
53+(7*2*2*2)
109+(7*2*2*2*2)…..
20/- per day
So, if he work one day
So,1*20=20
1/3*20=20/3
2/3*20=40/3
1/8*20=5/2
3/4*20=15
so,
20+20/3+40/3+5/2+15=57.5
So ans is 57.5 is the ans
grand daughter
habeas corpus